Rich Road Solar Energy Center (NYISO-800) — Project Summary

Queue ID
NYISO-800
Capacity
240 MW
Technology
Solar+Battery
Status
active
Location
St. Lawrence, NY
Region
NYISO
Developer
Rich Road Solar Energy Center, LLC
IA Status
Facility Study

Rich Road Solar Energy Center

NYISO-800BetaActiveSolarBatteryNYISOLBNL + Live

240 MW hybrid in St. Lawrence, NY · In queue since February 2019 · Proposed COD April 2028

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

240 MW

Capacity

1

Components

Solar

7y 9m

In Queue

Facility Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

9y 2m

Facilities Study50%
Queue EntryFeb 20, 2019

Interconnection request submitted to ISO/RTO

TCS StudyCurrent

Interconnection Queue; status 10

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-01

News-reported activity
as of 3y 10m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest activitycorporate_restructuringpv magazine USA · 2023-01-31

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. See the queue record for reported project facts.

Research COD
2028
From queue filing
Developer in saved assessment
Rich Road Solar Energy Center, LLC
From queue filing
Status at research time
Active
Active — state siting approval granted September 2024, advancing toward construction
Financing
Not recorded

Milestones in this assessment

Permit approvedSep 24, 2024Latest in this assessment

Office of Renewable Energy Siting approved construction of 240 MW solar project in Canton

wwnytv.com
Research sources and reasoning (1 recorded sources)

medium confidence at research time

  1. wwnytv.com/2024/09/24/state-approves-construction-large-canton-solar-project/

Commercial operation date: LBNL queue shows 2028-04-01 target. No contradicting signals from news or search results; state approval granted Sept 2024 supports timeline feasibility.

Developer: Only LBNL filing entity available. No parent company or operating entity identified in news or search results. Likely a project-specific LLC but ultimate owner unknown.

Status: LBNL shows 'active' in Facility Study phase. News confirms ORES approval Sept 2024, indicating project cleared major regulatory hurdle and remains viable.

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Rich Road Solar Energy Center is a proposed 240 MW hybrid solar and battery project located in St. Lawrence County, New York. Developed by EDF Renewables Development, Inc., the project consists of 240 MW of solar capacity. It is interconnected to the NYISO queue as entry NYISO-800, with a queue entry date of February 20, 2019. The proposed commercial operation date is April 1, 2028. As of the latest data, the project's interconnection status is in the System Impact Study phase.

The Rich Road Solar Energy Center is slated to connect to the Moses - Adirondack 230 kV Line #2 (MA2) and has appeared in recent news coverage pertaining to regulatory and industry matters.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

St. Lawrence

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Rich Road Solar Energy Center, LLC

Utility

NYPA

Entity

NYISO

Service Type

—

Point of Interconnection

Moses - Adirondack 230 kV Line #2 (MA2)

Data Source

LBNL + Live

CompanyEDF Renewables North Americapv magazine USA · 2023-01-31
AgencyOffice of Renewable Energy Siting and Electric TransmissionWWNY TV · 2024-09-24
RulingApprovalWWNY TV · 2024-09-24
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
MHK VL
Hub Confidence
MEDIUM
Nearest Node (Estimated)
24023
POI Substation
PYRITES___HYD

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (2)Beta

Last updated 2026-04-19

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.