Levy Grid, LLC
150 MW storage in Erie, NY · In queue since December 2018 · Proposed COD January 2027
Withdrawn from the NYISO queue, according to NYISO's queue (Sep 2026).
150 MW
Capacity
1
Components
Battery
7y 11m
In Queue
System Impact Study
IA Phase
Signed Jan 2023
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
4y 1m
IA → COD
4 years
Total Duration
4y 1m
Interconnection request submitted to ISO/RTO
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 6–18 months
Proposed COD: 2027-01-01
Project withdrew from interconnection queue
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
System Impact Study initiated per LBNL queue data
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with 2027-01-01 proposed COD. No independent news or press releases found to validate or update this target date.
Developer: No independent sources found. LBNL lists 'Levy Grid, LLC' as both project name and developer, suggesting this may be a project-specific LLC, but no parent company or operating entity could be identified through available research.
Status: LBNL shows 'active' status with System Impact Study initiated in January 2023. No news coverage found to indicate progression beyond interconnection studies.
About
Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Levy Grid, LLC is a proposed 150 MW battery storage project located in Erie County, New York. The development project, sponsored by Levy Grid, LLC, is interconnected within the New York Independent System Operator (NYISO) queue as entry NYISO-787. The project entered the queue on December 20, 2018, and has a proposed commercial operation date of August 1, 2025. Its interconnection status is currently in the System Impact Study phase. The project has been mentioned in recent news coverage.
The proposed project consists of 150 MW of battery storage capacity. The point of interconnection is the Gardenville Substation 115kV.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- NYISO queue source as of: Sep 30, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Erie
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Levy Grid, LLC
Utility
NM-NG
Entity
NYISO
Service Type
—
Point of Interconnection
Gardenville Subsation 115kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- ZONE A
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- BETHLEHEM___STEEL
- POI Substation
- Gardenville Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
KCE NY 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
KCE NY 31
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
KCE NY 21
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
KCE NY 30
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.