South Ripley Solar and BESS (NYISO-783) — Project Summary

Queue ID
NYISO-783
Capacity
270 MW
Technology
Solar+Battery
Status
active
Location
Chautauqua, NY
Region
NYISO
Developer
ConnectGen Chautauqua County LLC
IA Status
Facility Study

South Ripley Solar and BESS

NYISO-783BetaActiveSolarBatteryNYISOLBNL + Live

270 MW hybrid in Chautauqua, NY · In queue since December 2018 · Proposed COD December 2027

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

270 MW

Capacity

1

Components

Solar

7y 11m

In Queue

Facility Study

IA Phase

Signed Jan 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 1m

IA → COD

4y 11m

Total Duration

4y 1m

Construction50%
Queue EntryDec 7, 2018

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection AgreementJan 11, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Interconnection Queue; status 11

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-12-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 1, 2027
From queue filing
Developer in saved assessment
ConnectGen
Filed as ConnectGen Chautauqua County LLC
Status at research time
Active
Active — in Facility Study phase per NYISO queue, IA pending completion of interconnection studies
Financing
Not recorded

Milestones in this assessment

IA executedJan 2023Latest in this assessment

Facility Study phase initiated per LBNL queue data

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of December 2027. No independent news sources found to validate or contradict this target date.

Developer: LBNL filing entity is 'ConnectGen Chautauqua County LLC', a project-specific LLC. Parent operating company is ConnectGen, a renewable energy developer.

Status: LBNL shows 'active' status with IA status at 'Facility Study' stage as of January 2023. No news of withdrawal, suspension, or construction commencement found.

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The South Ripley Solar and BESS project is a proposed 270 MW hybrid solar and battery energy storage system development in Chautauqua County, New York. The project, being developed by ConnectGen Chautauqua County LLC, consists of 270 MW of solar generation. It is interconnected to the New York Independent System Operator (NYISO) queue as project number NYISO-783, with an original queue entry date of December 7, 2018.

The proposed commercial operation date for the South Ripley Solar and BESS project is January 1, 2027. Its interconnection status is currently in the Facility Study phase. The point of interconnection is the South Ripley Substation at 230kV. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Chautauqua

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

ConnectGen Chautauqua County LLC

Utility

NM-NG

Entity

NYISO

Service Type

—

Point of Interconnection

South Ripley Substation 230kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
23901
POI Substation
NEPA___ENERGY

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.