Sunrise Wind
880 MW generation in Suffolk, NY · In queue since September 2018 · Proposed COD July 2027
880 MW
Capacity
1
Components
Offshore Wind
8y 2m
In Queue
System Impact Study
IA Phase
Signed Jan 2023
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
4y 4m
IA → COD
4y 6m
Total Duration
4y 4m
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Interconnection Queue; status 12
Project under construction
Typical: 36–60 months
Proposed COD: 2027-07-01
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Ørsted states Sunrise Wind (924 MW) is expected to be operating in 2027.
sunrisewindny.comResearch sources and reasoning (6 recorded sources)
high confidence at research time
- sunrisewindny.com/about-sunrise-wind
- sunrisewindny.com/
- patch.com/new-york/shirley-mastic/924-megawatt-sunrise-wind-farm-shirley-coast-making-good-progress-official
- newsday.com/long-island/environment/sunrise-empire-wind-wurqm2w1
- en.wikipedia.org/wiki/Sunrise_Wind
- power-technology.com/projects/sunrise-wind-project-new-york/
Commercial operation date: Ørsted's project site says Sunrise Wind "is expected to be operating in 2027", Patch reports the project "is slated to be complete in 2027, Ørsted says", and Newsday says backers expect it to be fully operational next year. This matches the LBNL proposed COD of 2027-07-01, so only the year is stated.
Developer: The LBNL filing entity, Sunrise Wind LLC, is the project company. The Ørsted-branded project site lists it at its address, and Power Technology names Ørsted as developer. No ownership change is documented in the provided sources.
Status: Patch, Wikipedia and the Ørsted project site all describe Sunrise Wind as under construction. Newsday reports it pressing forward despite Trump administration resistance.
About
Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Sunrise Wind is a proposed 880 MW offshore wind generation project located in Suffolk County, New York. The project, developed by Sunrise Wind LLC, is interconnected to the NYISO grid under queue ID NYISO-766. The project entered the interconnection queue on September 28, 2018, and has a proposed commercial operation date of March 1, 2026. Its interconnection status is currently in the System Impact Study phase, and it will connect to the grid at Holbrook 138kV & West Bus 138kV.
The Sunrise Wind project has been the subject of recent news coverage, with 92 articles appearing in the press. These articles primarily focus on industry and development aspects of the project, with some coverage of regulatory and grid-related issues.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- NYISO queue source as of: Sep 30, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Suffolk
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Sunrise Wind LLC
Utility
LIPA
Entity
NYISO
Service Type
—
Point of Interconnection
Holbrook 138kV & West Bus 138kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- ZONE K
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- NGRID_A4_DSASP
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09
View all 10 articlesGeothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
KCE NY 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Max 4 Wind
Data tables and metrics from the InfraSure database.
KCE NY 31
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.