Moraine Solar Energy Center
93.5 MW generation in Allegany, NY · In queue since June 2018 · Proposed COD September 2028
93.5 MW
Capacity
1
Components
Solar
8y 1m
In Queue
Facility Study
IA Phase
COD target: 2028
Total Duration
10y 3m
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-01
The Moraine Solar Energy Center is a proposed 93.5 MW solar generation project located in Allegany County, New York. Developed by EDF Renewables Development, Inc., the project is interconnected to the New York State Electric and Gas (NYSEG) utility via the Moraine 115kV point of interconnection. It is currently listed as active in the New York Independent System Operator (NYISO) interconnection queue under queue ID NYISO-716, with an entry date of June 4, 2018.
The proposed commercial operation date for the Moraine Solar Energy Center is October 1, 2027. The project's interconnection status is currently in the System Impact Study phase. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Allegany
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Moraine Solar Energy Center, LLC
Utility
NYSEG
Entity
NYISO
Service Type
—
Point of Interconnection
Moraine 115kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- ZONE F
- Hub Confidence
- HIGH
- POI Substation
- Moraine Road Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.