Bear Ridge Solar
100 MW generation in Niagara, NY · In queue since March 2018 · Proposed COD April 2027
100 MW
Capacity
1
Components
Solar
8y 8m
In Queue
System Impact Study
IA Phase
Signed Feb 2021
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 11m
IA → COD
6y 2m
Total Duration
2y 11m
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Interconnection Queue; status 11
Project under construction
Typical: 12–24 months
Proposed COD: 2027-04-01
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
System Impact Study initiated per LBNL queue data
Proposed commercial operation date per LBNL queue filing
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of April 2027. No independent news or press releases found to validate or contradict this target date.
Developer: Only LBNL filing entity 'Bear Ridge Solar, LLC' is available. No press releases or corporate announcements found to identify a parent operating company or confirm if this is a project-specific shell LLC.
Status: LBNL shows 'active' status with System Impact Study initiated in 2021. No news coverage found to indicate construction start, permitting milestones, or project withdrawal.
About
Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Bear Ridge Solar is a proposed 100 MW solar generation project located in Niagara County, New York. The project, developed by Bear Ridge Solar, LLC, is interconnected to the NYISO queue under queue ID NYISO-704. The project entered the queue on March 20, 2018, and has a proposed commercial operation date of April 1, 2027. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is the Mountain-Lockport 115kV line.
The proposed project is linked to the existing Bear Ridge operating plant (EIA plant ID 67650). Recent news coverage indicates the project has been featured in eight news articles, primarily focusing on industry and regulatory topics.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- NYISO queue source as of: Sep 30, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Niagara
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Bear Ridge Solar, LLC
Utility
NM-NG
Entity
NYISO
Service Type
—
Point of Interconnection
Mountain- Lockport 115kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- WEST
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- 24167
- POI Substation
- MODEL_CITY_ENERGY
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesKCE NY 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
KCE NY 31
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
KCE NY 21
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
KCE NY 30
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.