Bear Ridge Solar (NYISO-704) — Project Summary

Queue ID
NYISO-704
Capacity
100 MW
Technology
Solar
Status
active
Location
Niagara, NY
Region
NYISO
Developer
Bear Ridge Solar, LLC
IA Status
System Impact Study

Bear Ridge Solar

NYISO-704BetaActiveSolarNYISOLBNL + Live

100 MW generation in Niagara, NY · In queue since March 2018 · Proposed COD April 2027

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

100 MW

Capacity

1

Components

Solar

8y 8m

In Queue

System Impact Study

IA Phase

Signed Feb 2021

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 11m

IA → COD

6y 2m

Total Duration

2y 11m

Construction25%
Queue EntryMar 20, 2018

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection AgreementFeb 8, 2021

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Interconnection Queue; status 11

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-04-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. See the queue record for reported project facts.

Research COD
Apr 1, 2027
From queue filing
Developer in saved assessment
Bear Ridge Solar, LLC
From queue filing
Status at research time
Active
Active — in System Impact Study phase since February 2021, no public updates on construction timeline or permitting progress
Financing
Not recorded

Milestones in this assessment

IA executedFeb 8, 2021

System Impact Study initiated per LBNL queue data

COD targetApr 1, 2027Latest in this assessment

Proposed commercial operation date per LBNL queue filing

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of April 2027. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing entity 'Bear Ridge Solar, LLC' is available. No press releases or corporate announcements found to identify a parent operating company or confirm if this is a project-specific shell LLC.

Status: LBNL shows 'active' status with System Impact Study initiated in 2021. No news coverage found to indicate construction start, permitting milestones, or project withdrawal.

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Bear Ridge Solar is a proposed 100 MW solar generation project located in Niagara County, New York. The project, developed by Bear Ridge Solar, LLC, is interconnected to the NYISO queue under queue ID NYISO-704. The project entered the queue on March 20, 2018, and has a proposed commercial operation date of April 1, 2027. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is the Mountain-Lockport 115kV line.

The proposed project is linked to the existing Bear Ridge operating plant (EIA plant ID 67650). Recent news coverage indicates the project has been featured in eight news articles, primarily focusing on industry and regulatory topics.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Niagara

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Bear Ridge Solar, LLC

Utility

NM-NG

Entity

NYISO

Service Type

—

Point of Interconnection

Mountain- Lockport 115kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
24167
POI Substation
MODEL_CITY_ENERGY

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.