Watkins Glen Solar (NYISO-617) — Project Summary

Queue ID
NYISO-617
Capacity
50 MW
Technology
Solar
Status
active
Location
Schuyler, NY
Region
NYISO
Developer
Watkins Glen Solar Energy Center, LLC
IA Status
System Impact Study

Watkins Glen Solar

NYISO-617BetaActiveSolarNYISOLBNL

50 MW generation in Schuyler, NY · In queue since March 2017 · Proposed COD April 2028

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

50 MW

Capacity

1

Components

Solar

9y 4m

In Queue

System Impact Study

IA Phase

Signed Dec 2020

Interconnection

Queue → IA

3y 9m

IA → COD

7y 4m

Total Duration

3y 9m

Construction25%
Queue EntryMar 27, 2017

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection AgreementDec 4, 2020

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-04-01

About

The Watkins Glen Solar project is a proposed 50 MW solar generation facility located in Schuyler County, New York. Developed by Watkins Glen Solar Energy Center, LLC, the project is interconnected to the NYSEG utility and participates in the NYISO interconnection queue as queue ID NYISO-617. The project entered the queue on March 27, 2017, and has a proposed commercial operation date of January 1, 2025. Its interconnection status is currently in the System Impact Study phase.

The proposed project consists of 50 MW of solar photovoltaic generation. It is interconnected to the Bath - Montour Falls 115kV point of interconnection. The Watkins Glen Solar project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Schuyler

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Watkins Glen Solar Energy Center, LLC

Utility

NYSEG

Entity

NYISO

Service Type

Point of Interconnection

Bath - Montour Falls 115kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE B
Hub Confidence
HIGH
Nearest Node (Estimated)
STEUBEN_REC_LFGE
POI Substation
Bath

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Watkins Glen Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.