Alle Catt II Wind (NYISO-596) — Project Summary

Queue ID
NYISO-596
Capacity
339.1 MW
Technology
Wind
Status
active
Location
Cattaraugus, NY
Region
NYISO
Developer
Alle-Catt Wind Energy LLC
IA Status
System Impact Study

Alle Catt II Wind

NYISO-596BetaActiveWindNYISOLBNL + Live

339.1 MW generation in Cattaraugus, NY · In queue since January 2017 · Proposed COD December 2026

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

339.1 MW

Capacity

1

Components

Wind

9y 10m

In Queue

System Impact Study

IA Phase

Signed Feb 2021

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 1m

IA → COD

5y 10m

Total Duration

4y 1m

Construction25%
Queue EntryJan 4, 2017

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection AgreementFeb 8, 2021

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Interconnection Queue; status 12

Project under construction

Typical: 18–36 months

Commercial Operation

Proposed COD: 2026-12-01

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneconstruction start · Q2 2025The Business Journals · 2026-01-22
Expected COD2024-12The Business Journals · 2026-01-22

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 1, 2026
Developer in saved assessment
Invenergy
Filed as Alle-Catt Wind Energy LLC
Status at research time
Construction
Active in queue; the wind farm is in late-stage construction, nearly complete as of Oct 2026, with operation contingent on meeting state conditions.
Financing
Not recorded

Milestones in this assessment

Permit approvedApr 2026

NY Department of Public Service gave final approval for Alle-Catt to complete wind farm construction.

oleanstar.com
COD targetDec 2026Latest in this assessment

Invenergy's 76 turbines are set to generate power by December 2026.

bizjournals.com
Research sources and reasoning (6 recorded sources)

high confidence at research time

  1. bizjournals.com/buffalo/news/2026/01/22/alle-catt-wind-farm-construction-turbines.html
  2. bizjournals.com/buffalo/news/2026/10/01/alle-catt-wind-farm-build-construction-update.html
  3. oleanstar.com/blog/2026/10/23/alle-catt-wind-turbines-poised-to-start-operating-in-coming-months-if-developer-meets-conditions/
  4. oleanstar.com/blog/2026/04/08/alle-catt-gets-final-state-ok-to-complete-wind-farm-construction-despite-noise-concerns/
  5. btpm.org/local/2025-02-06/chicago-firm-to-invest-618-million-in-cattaraugus-county-wind-turbine-development
  6. allecattwind.invenergy.com/

Commercial operation date: The Jan 2026 Business Journals piece says Invenergy's 76 turbines are "set to generate power by December" (2026), and an Oct 2026 article says the project is "nearly ready to flip the switch." Both match LBNL's 2026-12-01. The extracted 'expected_cod' of 2024-12 contradicts the same article and is treated as an extraction error.

Developer: LBNL lists the project LLC (Alle-Catt Wind Energy LLC). The Business Journals, BTPM and the project website allallecattwind.invenergy.com all name Invenergy as the builder and operator.

Status: The Jan 2026 article reports the farm is under construction and the Oct 2026 article says it is nearing completion. The Olean Star reports final DPS approval to complete construction in April 2026 and says the turbines are poised to start operating if the developer meets conditions. The LBNL 'System Impact Study' status is outdated.

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Alle Catt II Wind project is a proposed wind generation facility with a total capacity of 339.1 MW. Located in Cattaraugus County, New York, the project is being developed by Alle-Catt Wind Energy LLC. It is currently in the System Impact Study phase of the New York Independent System Operator (NYISO) interconnection queue, under queue ID NYISO-596, with an original queue entry date of January 4, 2017. The proposed commercial operation date is December 1, 2026.

The Alle Catt II Wind project has been the subject of recent news coverage related to regulatory matters.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Cattaraugus

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Alle-Catt Wind Energy LLC

Utility

NM-NG

Entity

NYISO

Service Type

—

Point of Interconnection

Stolle Rd - Five Mile Rd 345kV

Data Source

LBNL + Live

DeveloperInvenergy±The Business Journals · 2026-01-22
ApplicantAlle-Catt Wind Energy LLCOlean Star · 2024-06-27
AgencyNew York State Board on Electric Generation Siting and the EnvironmentOlean Star · 2024-06-27
RulingApprovalOlean Star · 2024-06-27
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE A
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (4)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.