Alle Catt II Wind
339.1 MW generation in Cattaraugus, NY · In queue since January 2017 · Proposed COD December 2026
339.1 MW
Capacity
1
Components
Wind
9y 10m
In Queue
System Impact Study
IA Phase
Signed Feb 2021
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
4y 1m
IA → COD
5y 10m
Total Duration
4y 1m
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Interconnection Queue; status 12
Project under construction
Typical: 18–36 months
Proposed COD: 2026-12-01
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
NY Department of Public Service gave final approval for Alle-Catt to complete wind farm construction.
oleanstar.comInvenergy's 76 turbines are set to generate power by December 2026.
bizjournals.comResearch sources and reasoning (6 recorded sources)
high confidence at research time
- bizjournals.com/buffalo/news/2026/01/22/alle-catt-wind-farm-construction-turbines.html
- bizjournals.com/buffalo/news/2026/10/01/alle-catt-wind-farm-build-construction-update.html
- oleanstar.com/blog/2026/10/23/alle-catt-wind-turbines-poised-to-start-operating-in-coming-months-if-developer-meets-conditions/
- oleanstar.com/blog/2026/04/08/alle-catt-gets-final-state-ok-to-complete-wind-farm-construction-despite-noise-concerns/
- btpm.org/local/2025-02-06/chicago-firm-to-invest-618-million-in-cattaraugus-county-wind-turbine-development
- allecattwind.invenergy.com/
Commercial operation date: The Jan 2026 Business Journals piece says Invenergy's 76 turbines are "set to generate power by December" (2026), and an Oct 2026 article says the project is "nearly ready to flip the switch." Both match LBNL's 2026-12-01. The extracted 'expected_cod' of 2024-12 contradicts the same article and is treated as an extraction error.
Developer: LBNL lists the project LLC (Alle-Catt Wind Energy LLC). The Business Journals, BTPM and the project website allallecattwind.invenergy.com all name Invenergy as the builder and operator.
Status: The Jan 2026 article reports the farm is under construction and the Oct 2026 article says it is nearing completion. The Olean Star reports final DPS approval to complete construction in April 2026 and says the turbines are poised to start operating if the developer meets conditions. The LBNL 'System Impact Study' status is outdated.
About
Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Alle Catt II Wind project is a proposed wind generation facility with a total capacity of 339.1 MW. Located in Cattaraugus County, New York, the project is being developed by Alle-Catt Wind Energy LLC. It is currently in the System Impact Study phase of the New York Independent System Operator (NYISO) interconnection queue, under queue ID NYISO-596, with an original queue entry date of January 4, 2017. The proposed commercial operation date is December 1, 2026.
The Alle Catt II Wind project has been the subject of recent news coverage related to regulatory matters.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- NYISO queue source as of: Sep 30, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Cattaraugus
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Alle-Catt Wind Energy LLC
Utility
NM-NG
Entity
NYISO
Service Type
—
Point of Interconnection
Stolle Rd - Five Mile Rd 345kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- ZONE A
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09
View all articlesKCE NY 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Max 4 Wind
Data tables and metrics from the InfraSure database.
KCE NY 31
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
FPL Energy Oliver Wind II LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.