Little Pond Solar (NYISO-575) — Project Summary

Queue ID
NYISO-575
Capacity
20 MW
Technology
Solar
Status
active
Location
Orange, NY
Region
NYISO
Developer
Little Pond Solar, LLC
IA Status
Facility Study

Little Pond Solar

NYISO-575BetaActiveSolarNYISOLBNL

20 MW generation in Orange, NY · In queue since September 2016 · Proposed COD September 2027

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

20 MW

Capacity

1

Components

Solar

9y 10m

In Queue

Facility Study

IA Phase

Signed Jan 2021

Interconnection

Queue → IA

4y 4m

IA → COD

6y 8m

Total Duration

4y 4m

Construction50%
Queue EntrySep 16, 2016

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection AgreementJan 29, 2021

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-09-01

About

Little Pond Solar is a proposed 20 MW solar generation project located in Orange County, New York. The project, developed by Little Pond Solar, LLC, is interconnected to the NYISO grid under queue ID NYISO-575. The project entered the NYISO interconnection queue on September 16, 2016, and has a proposed commercial operation date of January 1, 2025. Its interconnection status is currently in the Facility Study phase.

The proposed point of interconnection is the Mongaup - Shoemaker 69kV line. The project is actively listed in the NYISO interconnection queue. The local utility is O&R.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Orange

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Little Pond Solar, LLC

Utility

O&R

Entity

NYISO

Service Type

Point of Interconnection

Mongaup - Shoemaker 69kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE G
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.