Little Pond Solar
20 MW generation in Orange, NY · In queue since September 2016 · Proposed COD September 2027
20 MW
Capacity
1
Components
Solar
9y 10m
In Queue
Facility Study
IA Phase
Signed Jan 2021
Queue → IA
4y 4m
IA → COD
6y 8m
Total Duration
4y 4m
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2027-09-01
Little Pond Solar is a proposed 20 MW solar generation project located in Orange County, New York. The project, developed by Little Pond Solar, LLC, is interconnected to the NYISO grid under queue ID NYISO-575. The project entered the NYISO interconnection queue on September 16, 2016, and has a proposed commercial operation date of January 1, 2025. Its interconnection status is currently in the Facility Study phase.
The proposed point of interconnection is the Mongaup - Shoemaker 69kV line. The project is actively listed in the NYISO interconnection queue. The local utility is O&R.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Orange
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Little Pond Solar, LLC
Utility
O&R
Entity
NYISO
Service Type
—
Point of Interconnection
Mongaup - Shoemaker 69kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- ZONE G
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.