Canisteo Wind
290.7 MW generation in Steuben, NY · In queue since November 2015 · Proposed COD December 2027
290.7 MW
Capacity
1
Components
Wind
11 years
In Queue
Facility Study
IA Phase
Signed Feb 2021
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
5y 3m
IA → COD
6y 10m
Total Duration
5y 3m
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Interconnection Queue; status 11
Project under construction
Typical: 18–36 months
Proposed COD: 2027-12-01
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
20-year physical PPA secured with New York Power Authority
eveningtribune.comInterconnection Agreement executed with NYISO
eveningtribune.comResearch sources and reasoning (1 recorded sources)
low confidence at research time
Commercial operation date: Only LBNL queue data provides a COD target of December 2027. No recent news or press releases found to corroborate or update this date.
Developer: LBNL filing entity is 'Canisteo Wind Energy LLC' (project SPV), but 2019 news article identifies Invenergy as the actual developer/operator behind the project.
Status: LBNL shows 'active' status with Facility Study ongoing since 2021 IA execution. 2019 news confirms 20-year PPA with New York Power Authority was secured, indicating project remains viable.
About
Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Canisteo Wind project is a proposed wind energy generation project located in Steuben County, New York. The project, developed by Canisteo Wind Energy LLC, has a total capacity of 289.8 MW. It is interconnected to the New York Independent System Operator (NYISO) queue under queue ID NYISO-519, with an entry date of November 2, 2015. The proposed commercial operation date is December 1, 2027, and its interconnection status is currently in the Facility Study phase.
The proposed project is linked to the existing Canisteo Wind Farm (EIA plant ID 62947). The project has been the subject of recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- NYISO queue source as of: Sep 30, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Steuben
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Canisteo Wind Energy LLC
Utility
NYSEG
Entity
NYISO
Service Type
—
Point of Interconnection
Bennett 115kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- ZONE B
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- DUNKIRK__115KV_TB_200
- POI Substation
- Bennett Road Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesKCE NY 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Max 4 Wind
Data tables and metrics from the InfraSure database.
KCE NY 31
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
FPL Energy Oliver Wind II LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.