Globe DH 3 (NYISO-1749) — Project Summary

Queue ID
NYISO-1749
Capacity
200 MW
Technology
Other
Status
no_longer_listed
Location
niagara falls, NY
Region
NYISO
Developer
GLOBE DH LLC
IA Status
—

Globe DH 3

NYISO-1749BetaNo longer listedLNYISOLive · NYISO

200 MW generation in niagara falls, NY · In queue since October 2025

No longer in NYISO's queue (Sep 2026).

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

200 MW

Capacity

0

Components

1y 1m

In Queue

—

IA Status

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 1m

Pre-Study0%
Queue EntryOct 17, 2025

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. See the queue record for reported project facts.

Research COD
—
Developer in saved assessment
GLOBE DH LLC
From queue filing
Status at research time
Active
Active — recently entered queue (Oct 2025), no construction or development milestones publicly announced
Financing
Not recorded

Milestones in this assessment

IA executedOct 2025Latest in this assessment

Project entered NYISO interconnection queue

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: No COD provided in LBNL queue snapshot and no news or search results available to establish a target date.

Developer: Only LBNL filing entity available. No search results to identify parent company or operating entity behind the project LLC.

Status: LBNL status shows active queue position from October 2025. No contradicting information or development updates found.

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Globe DH 3 is a proposed 100 MW generation project located in Niagara Falls, Niagara County, New York. The project, developed by Globe DH LLC, is listed in the New York Independent System Operator (NYISO) interconnection queue as entry NYISO-1749, with a queue entry date of October 17, 2025. The proposed point of interconnection is at lines 187 and 188, and the project's status is currently listed as active.

The project utilizes an "Other" technology type, specified as "L". The intended utility for the project is National Grid.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

niagara falls

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

GLOBE DH LLC

Utility

National Grid

Entity

NYISO

Service Type

—

Point of Interconnection

Niagara Packard 77 230kV

Data Source

Live · NYISO

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE F
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.