St. Lawrence Infrastructure 2 (NYISO-1743) — Project Summary

Queue ID
NYISO-1743
Capacity
1935 MW
Technology
Other
Status
no_longer_listed
Location
St. Lawrence, NY
Region
NYISO
Developer
St. Lawrence Infrastructure, LLC
IA Status
—

St. Lawrence Infrastructure 2

NYISO-1743BetaNo longer listedLNYISOLive · NYISO

1,935 MW generation in St. Lawrence, NY · In queue since September 2025

No longer in NYISO's queue (Sep 2026).

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

1,935 MW

Capacity

0

Components

1y 2m

In Queue

—

IA Status

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 2m

Pre-Study0%
Queue EntrySep 2, 2025

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. See the queue record for reported project facts.

Research COD
—
Developer in saved assessment
St. Lawrence Infrastructure, LLC
From queue filing
Status at research time
Active
Active — recently entered queue (Sept 2025), no construction or milestone announcements found
Financing
Not recorded

Milestones in this assessment

IA executedSep 2, 2025Latest in this assessment

Project entered NYISO interconnection queue

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: No COD information available in LBNL snapshot (proposed_cod is null) and no news or search results provided any target date.

Developer: Only LBNL filing entity available. No news or search results to confirm parent company or identify if this is a shell LLC for a larger developer.

Status: LBNL shows 'active' status with very recent queue date (2025-09-02). No contradicting information or progress updates found in available sources.

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

St. Lawrence Infrastructure 2 is a proposed 1935 MW generation project located in St. Lawrence County, New York. The project, developed by St. Lawrence Infrastructure, LLC, is interconnected to the New York Power Authority (NYPA) grid at the 230kV Moses Massena 1 (MMS-1) and 230kV Moses Massena 2 (MMS-2) points of interconnection. The project entered the NYISO interconnection queue on September 2, 2025, under queue ID NYISO-1743.

The project's technology is listed as "Other" with a detail of "L". The project is currently listed as active in the NYISO queue. Recent news coverage has highlighted the project, with articles focusing on regulatory and industry aspects.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

St. Lawrence

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

St. Lawrence Infrastructure, LLC

Utility

NYPA

Entity

NYISO

Service Type

—

Point of Interconnection

NYPA's 230kV Moses Massena 1 (MMS-1) and 230kV Moses Massena 2 (MMS-2)

Data Source

Live · NYISO

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE D
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.