Ames Road Station
— generation in Montgomery, NY · In queue since February 2024
—
Capacity
0
Components
2y 8m
In Queue
—
IA Status
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 8m
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Ames Road Station is a proposed development project in Montgomery County, New York, listed in the New York Independent System Operator (NYISO) interconnection queue under queue ID NYISO-1672. The project is being developed by National Grid and is classified as a generation project with a technology type of "Other," with the technology detail specified as AC. The total capacity of the project is not specified in the available data. The transmission owners associated with the project are listed as NM-NG (National Grid) and LS Power.
The project entered the NYISO queue on February 5, 2024, and its status is active. Its proposed point of interconnection involves multiple transmission circuits: the 345 kV Edic–Princetown 351 and 352 lines, the 115 kV Saint Johnsville–Marshville 11 line, and the 115 kV Clinton–Marshville 12 line. The available data do not include a proposed commercial operation date or the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Montgomery
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
National Grid
Utility
Transmission Owner NM-NG, LS Power Transmission Owner NaN Name: 93, dtype: object
Entity
NYISO
Service Type
—
Point of Interconnection
345kV Edic Princetown 351 345kV Edic Princetwon 352 115kV Saint Johnsville Mashville 11 115kV Clinton Marshville 12
Data Source
Live · NYISO
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- ZONE E
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Ames Road StationForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.