Liberty Green Line (NYISO-1555) — Project Summary

Queue ID
NYISO-1555
Capacity
—
Technology
Other
Status
active
Location
New York County, NY
Region
NYISO
Developer
North Bergen Liberty Generating LLC
IA Status
—

Liberty Green Line

NYISO-1555BetaActiveACNYISOLive · NYISO

— generation in New York County, NY · In queue since May 2023

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

—

Capacity

0

Components

3y 5m

In Queue

—

IA Status

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 5m

Pre-Study0%
Queue EntryMay 12, 2023

Interconnection request submitted to ISO/RTO

TCS Study

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

Liberty Green Line is a proposed development project in New York County, New York, listed in the New York Independent System Operator (NYISO) interconnection queue under queue ID NYISO-1555. The developer is North Bergen Liberty Generating LLC. The project is categorized as a generation project with a technology type of "Other," and its technology detail is listed as AC (alternating current). Its total capacity is not specified in the available data.

The project entered the NYISO queue on May 12, 2023, and its status is active. The proposed point of interconnection is Con Edison's West 49th Street 345 kV Substation. Con Edison is listed as the transmission owner, and PJM is also referenced in the utility information. The available data does not include a proposed commercial operation date or an interconnection agreement status.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

New York County

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

North Bergen Liberty Generating LLC

Utility

Transmission Owner ConEd, PJM Transmission Owner NaN Name: 90, dtype: object

Entity

NYISO

Service Type

—

Point of Interconnection

Con Edison W 49th St 345kV Substation

Data Source

Live · NYISO

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE F
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Liberty Green Line
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.