Mineral Basin Solar Power
401.6 MW generation in Clearfield, PA · In queue since August 2020 · Proposed COD December 2028
401.6 MW
Capacity
1
Components
Solar
5y 11m
In Queue
System Impact Study
IA Phase
COD target: 2028
Total Duration
8y 4m
Interconnection request submitted to ISO/RTO
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-01
Mineral Basin Solar Power is a proposed solar generation project located in Clearfield County, Pennsylvania. The project, developed by Mineral Basin Solar Power, LLC, has a total capacity of 401.6 MW. It is listed in the NYISO interconnection queue as entry NYISO-1080, with a queue entry date of August 21, 2020, and a proposed commercial operation date of May 1, 2028. The project's interconnection status is currently in the System Impact Study phase.
The proposed project is linked to the existing Mineral Basin Solar Power operating plant (EIA ID 67378). Recent news coverage indicates interest in the project, with articles focusing on regulatory and industry aspects.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
PA
County
Clearfield
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Mineral Basin Solar Power, LLC
Utility
NYSEG
Entity
NYISO
Service Type
—
Point of Interconnection
Homer City - Mainesburg 345KV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- NYISO Zone A
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.