Mineral Basin Solar Power (NYISO-1080) — Project Summary

Queue ID
NYISO-1080
Capacity
401.6 MW
Technology
Solar
Status
active
Location
Clearfield, PA
Region
NYISO
Developer
Mineral Basin Solar Power, LLC
IA Status
System Impact Study

Mineral Basin Solar Power

NYISO-1080BetaActiveSolarNYISOLBNL + Live

401.6 MW generation in Clearfield, PA · In queue since August 2020 · Proposed COD December 2028

BA: PJMISO/RTO: NYISONERC: RFCRC: PJM

401.6 MW

Capacity

1

Components

Solar

6y 3m

In Queue

System Impact Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

8y 4m

Impact Study25%
Queue EntryAug 21, 2020

Interconnection request submitted to ISO/RTO

TCS StudyCurrent

Interconnection Queue; status 10

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-01

News-reported activity
as of 2y 2m ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestonePhase 1 activities begin · 2024-Q2The Progress · 2024-09-27
Expected COD2026-H2Electrek · 2024-03-21

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
2026
Differs from queue: Dec 1, 2028
Developer in saved assessment
Swift Current Energy
Filed as Mineral Basin Solar Power, LLC
Status at research time
Active
Active in the NYISO queue (System Impact Study, no IA date). PA DEP Chapter 105 permit issued July 2025. Developer materials still say 'Under development', while a March 2026 article cites a summer 2024 construction start.
Financing
Not recorded
No closed project or construction financing found. The project has an award of up to $90M from the DOE Clean Energy Demonstrations program (announced March 2024) and a 20-year NYSERDA contract. Search results also mention DOE cancelling award tranches in late 2025, but none of the snippets names this project, so its grant status is unverified.

Milestones in this assessment

Groundbreaking2024

Construction Review reports a construction start in summer 2024. The Progress separately reports Phase 1 activities beginning in September 2024.

constructionreviewonline.com
Permit approvedJul 12, 2025

PA DEP published notice of an issued Chapter 105 encroachments permit for the 400 MW, 2,716-acre Mineral Basin project.

paenvironmentdaily.blogspot.com
COD target2026Latest in this assessment

Target commissioning is the second half of 2026 (article also says Q2 2026).

constructionreviewonline.com
Research sources and reasoning (6 recorded sources)

medium confidence at research time

  1. constructionreviewonline.com/swift-current-energy-secures-20-year-power-contract-for-mineral-basin-solar-project/
  2. swiftcurrentenergy.com/project/mineral-basin-solar/
  3. electrek.co/2024/03/21/pennsylvanias-largest-solar-farm-will-replace-its-largest-coal-plant/
  4. paenvironmentdaily.blogspot.com/2025/07/dep-approves-permit-for-400-mw-2716.html
  5. theprogressnews.com/news/mineral-basin-solar-project-in-girard-township-to-begin-phase-1-activities/article_6c87341c-7cee-11ef-9577-8b859ebd6bf4.html
  6. yardsale.energy/wp-content/uploads/2025/10/Factsheet_CEML_MineralBasin_9.24.24.pdf

Commercial operation date: LBNL lists 2028-12-01, but the March 2026 Construction Review article gives a 'Target commissioning date: Second half of 2026', and the March 2024 Electrek-derived news fact also gives 2026-H2. Two post-LBNL signals agree on 2026, about 2 years ahead of LBNL. The same article also says 'Q2 2026', so only the year is reliable.

Developer: LBNL, DOE-related news and the PA DEP permit name the project LLC 'Mineral Basin Solar Power, LLC'. The Swift Current Energy project page and the Construction Review article identify Swift Current Energy as the developer behind it.

Status: LBNL shows 'active' and nothing indicates withdrawal or cancellation. The project has its state permit and a NYSERDA contract. Construction progress is inconsistently reported, so 'Construction' is not confirmed.

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Mineral Basin Solar Power is a proposed solar generation project located in Clearfield County, Pennsylvania. The project, developed by Mineral Basin Solar Power, LLC, has a total capacity of 401.6 MW. It is listed in the NYISO interconnection queue as entry NYISO-1080, with a queue entry date of August 21, 2020, and a proposed commercial operation date of May 1, 2028. The project's interconnection status is currently in the System Impact Study phase.

The proposed project is linked to the existing Mineral Basin Solar Power operating plant (EIA ID 67378). Recent news coverage indicates interest in the project, with articles focusing on regulatory and industry aspects.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

PA

County

Clearfield

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

Mineral Basin Solar Power, LLC

Utility

NYSEG

Entity

NYISO

Service Type

—

Point of Interconnection

Homer City - Mainesburg 345KV

Data Source

LBNL + Live

ApplicantMineral Basin Solar Power, LLCPA Environment Digest Blog · 2025-07-12
AgencyPennsylvania Department of Environmental ProtectionPA Environment Digest Blog · 2025-07-12
RulingApprovalPA Environment Digest Blog · 2025-07-12
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
WEST
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (3)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.