Mineral Basin Solar Power
401.6 MW generation in Clearfield, PA · In queue since August 2020 · Proposed COD December 2028
401.6 MW
Capacity
1
Components
Solar
6y 3m
In Queue
System Impact Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
8y 4m
Interconnection request submitted to ISO/RTO
Interconnection Queue; status 10
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-01
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Construction Review reports a construction start in summer 2024. The Progress separately reports Phase 1 activities beginning in September 2024.
constructionreviewonline.comPA DEP published notice of an issued Chapter 105 encroachments permit for the 400 MW, 2,716-acre Mineral Basin project.
paenvironmentdaily.blogspot.comTarget commissioning is the second half of 2026 (article also says Q2 2026).
constructionreviewonline.comResearch sources and reasoning (6 recorded sources)
medium confidence at research time
- constructionreviewonline.com/swift-current-energy-secures-20-year-power-contract-for-mineral-basin-solar-project/
- swiftcurrentenergy.com/project/mineral-basin-solar/
- electrek.co/2024/03/21/pennsylvanias-largest-solar-farm-will-replace-its-largest-coal-plant/
- paenvironmentdaily.blogspot.com/2025/07/dep-approves-permit-for-400-mw-2716.html
- theprogressnews.com/news/mineral-basin-solar-project-in-girard-township-to-begin-phase-1-activities/article_6c87341c-7cee-11ef-9577-8b859ebd6bf4.html
- yardsale.energy/wp-content/uploads/2025/10/Factsheet_CEML_MineralBasin_9.24.24.pdf
Commercial operation date: LBNL lists 2028-12-01, but the March 2026 Construction Review article gives a 'Target commissioning date: Second half of 2026', and the March 2024 Electrek-derived news fact also gives 2026-H2. Two post-LBNL signals agree on 2026, about 2 years ahead of LBNL. The same article also says 'Q2 2026', so only the year is reliable.
Developer: LBNL, DOE-related news and the PA DEP permit name the project LLC 'Mineral Basin Solar Power, LLC'. The Swift Current Energy project page and the Construction Review article identify Swift Current Energy as the developer behind it.
Status: LBNL shows 'active' and nothing indicates withdrawal or cancellation. The project has its state permit and a NYSERDA contract. Construction progress is inconsistently reported, so 'Construction' is not confirmed.
About
Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Mineral Basin Solar Power is a proposed solar generation project located in Clearfield County, Pennsylvania. The project, developed by Mineral Basin Solar Power, LLC, has a total capacity of 401.6 MW. It is listed in the NYISO interconnection queue as entry NYISO-1080, with a queue entry date of August 21, 2020, and a proposed commercial operation date of May 1, 2028. The project's interconnection status is currently in the System Impact Study phase.
The proposed project is linked to the existing Mineral Basin Solar Power operating plant (EIA ID 67378). Recent news coverage indicates interest in the project, with articles focusing on regulatory and industry aspects.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- NYISO queue source as of: Sep 30, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
PA
County
Clearfield
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Mineral Basin Solar Power, LLC
Utility
NYSEG
Entity
NYISO
Service Type
—
Point of Interconnection
Homer City - Mainesburg 345KV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- WEST
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesSolar queue pipeline by status
Data tables and metrics from the InfraSure database.
Solar queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.