Yellow Barn Solar
160 MW generation in Tompkins, NY · In queue since April 2020 · Proposed COD December 2028
160 MW
Capacity
1
Components
Solar
6y 7m
In Queue
System Impact Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
8y 8m
Interconnection request submitted to ISO/RTO
Interconnection Queue; status 11
NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.
Typical: >42 months (historical); ~24 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-01
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Research sources and reasoning (2 recorded sources)
high confidence at research time
- ithaca.com/news/groton/new-york-s-largest-solar-project-is-coming-to-tompkins-county/article_1f2eae30-16eb-11ee-b9c8-8fab10986f1a.html
- wskg.org/regional-news/2024-12-22/state-officials-issue-draft-permit-for-proposed-major-solar-project-in-tompkins-county
Commercial operation date: LBNL queue lists 2028-12-01, but June 2023 Ithaca Times article quotes CS Energy targeting 2026 COD with Q4 2024 construction start. 2-year gap suggests LBNL date is stale from initial filing.
Developer: LBNL filing entity is 'Yellow Barn Solar, LLC' (project SPV), but news sources (Ithaca Times, WSKG) consistently identify CS Energy as the developer and applicant for state permits.
Status: LBNL shows 'active' in System Impact Study phase. December 2024 WSKG article confirms state officials issued draft permit, indicating project advancing through regulatory process.
About
Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Yellow Barn Solar is a proposed 160 MW solar generation project located in Tompkins County, New York. The developer is Yellow Barn Solar, LLC, and the interconnecting utility is NYSEG. The project is listed in the NYISO interconnection queue as queue ID NYISO-1009, with an entry date of April 30, 2020. Its proposed commercial operation date is December 1, 2025, and its interconnection status is currently in the System Impact Study phase.
The proposed project is linked to the existing Yellow Barn Solar operating plant (EIA plant ID 68584). Recent news coverage indicates the project has been featured in at least six news articles related to industry, deals, and regulatory matters.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- NYISO queue source as of: Sep 30, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NY
County
Tompkins
Grid Region
NYISO (New York)
Market
ISO/RTO Member
Developer
Yellow Barn Solar, LLC
Utility
NYSEG
Entity
NYISO
Service Type
—
Point of Interconnection
Milliken - Etna 115 kV line #975
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- NYISO
- Trading Hub
- MHK VL
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesKCE NY 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
KCE NY 31
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
KCE NY 21
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
KCE NY 30
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.