NYC Energy LLC - Phase 2 (NYISO-1007) — Project Summary

Queue ID
NYISO-1007
Capacity
220.1 MW
Technology
Battery
Status
active
Location
Kings, NY
Region
NYISO
Developer
NYC Energy
IA Status
System Impact Study

NYC Energy LLC - Phase 2

NYISO-1007BetaActiveBatteryNYISOLBNL + Live

220.1 MW storage in Kings, NY · In queue since April 2020 · Proposed COD June 2027

BA: NYISISO/RTO: NYISONERC: NPCCRC: NYIS

220.1 MW

Capacity

1

Components

Battery

6y 7m

In Queue

System Impact Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7y 2m

Impact Study25%
Queue EntryApr 22, 2020

Interconnection request submitted to ISO/RTO

TCS StudyCurrent

Interconnection Queue; status 12

NYISO transitioned to a Transitional Cluster Study (TCS) format in 2024.

Typical: >42 months (historical); ~24 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-06-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Sep 30, 2026 queue source. See the queue record for reported project facts.

Research COD
Jun 1, 2027
From queue filing
Developer in saved assessment
NYC Energy
From queue filing
Status at research time
Active
Active — in System Impact Study phase per NYISO queue, no public construction or financing announcements
Financing
Not recorded

Milestones in this assessment

COD targetJun 1, 2027Latest in this assessment

Proposed commercial operation date per NYISO queue filing

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of June 2027. No independent news or press releases found to validate or contradict this target date.

Developer: LBNL lists 'NYC Energy' as developer with legal entity 'NYC Energy LLC'. No press releases or corporate announcements found to identify parent company or confirm operating entity structure.

Status: LBNL shows active queue status in System Impact Study phase. No news coverage found to indicate project progression beyond interconnection studies.

About

Saved background

Generated Apr 10, 2026 · Predates Sep 30, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

NYC Energy LLC - Phase 2 is a proposed 220.1 MW battery storage project located in Kings County, New York. The developer is NYC Energy, and the interconnecting utility is ConEd. This project is listed in the NYISO interconnection queue as queue ID NYISO-1007, with an entry date of April 22, 2020, and a proposed commercial operation date of June 1, 2027. The project's interconnection status is currently in the System Impact Study phase.

The proposed project is linked to the existing NISA Electric Generation Project operating plant (EIA plant ID 61331). NYC Energy LLC - Phase 2 has been mentioned in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • NYISO queue source as of: Sep 30, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

NY

County

Kings

Grid Region

NYISO (New York)

Market

ISO/RTO Member

Developer

NYC Energy

Utility

ConEd

Entity

NYISO

Service Type

—

Point of Interconnection

Hudson Ave 138 kV

Data Source

LBNL + Live

DeveloperHexagon EnergyMercom Capital Group · 2026-02-28
TransactionAcquisitionMercom Capital Group · 2026-02-28
OfftakerTerraForm PowerMercom Capital Group · 2026-02-28
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
NYISO
Trading Hub
ZONE J
Hub Confidence
MEDIUM
Nearest Node (Estimated)
FARRAGUT_138_KV_32071_REV_LBMP_J
POI Substation
HUDSON AVE_GT_3

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.