N-C-NC5-010
500 MW hybrid in Kane, UT · In queue since March 2024 · Proposed COD May 2028
500 MW
Capacity
1
Components
Solar
2y 2m
In Queue
—
IA Status
COD target: 2028
Total Duration
4y 2m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-05-30
The proposed project N-C-NC5-010 is a 500 MW hybrid Solar+Battery development project located in Kane County, Utah. The project consists of 500 MW of solar capacity. It is being proposed by developer N-C and is interconnected with the Navajo-Crystal utility.
The project is currently active in the Navajo-Crystal interconnection queue, having entered the queue on March 26, 2024. The proposed commercial operation date is May 30, 2028. The point of interconnection is the Navajo-Crystal 525 kV Line.
Generated from interconnection queue and public data sources
State
UT
County
Kane
Grid Region
Mountain West
Market
—
Developer
—
Utility
Navajo-Crystal
Entity
N-C
Service Type
—
Point of Interconnection
Navajo-Crystal 525 kV Line
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- FOURCORNERS
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.