MPC-MPC04400
205.9 MW generation in Grand Forks, ND · In queue since February 2022 · Proposed COD December 2024
205.9 MW
Capacity
1
Components
Wind
4y 5m
In Queue
System Impact Study
IA Phase
COD target: 2024
Total Duration
2y 10m
Schedule
19 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-23
MPC-MPC04400 is a proposed wind generation project with a total capacity of 205.9 MW. The project is located in Grand Forks County, North Dakota, and is being developed by Minnkota Power Cooperative (MPC). It is currently active in the Midcontinent Independent System Operator (MISO) interconnection queue, with a queue entry date of February 4, 2022. The proposed commercial operation date is December 23, 2024. The project's interconnection status is currently in the System Impact Study phase, and the point of interconnection (POI) is the Center-Prairie 345 kV Line.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
ND
County
Grand Forks
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
Minnkota Power Cooperative
Entity
MPC
Service Type
NRIS
Point of Interconnection
Center-Prairie 345 kV Line
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project MPC-MPC04400Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.