Project MISO-S1179 — Project Summary

Queue ID
MISO-S1179
Capacity
150 MW
Technology
Battery
Status
active
Location
Portage, WI
Region
MISO
Developer
—
IA Status
—

MISO-S1179

MISO-S1179BetaActiveBattery StorageMISOLive · MISO

150 MW storage in Portage, WI · In queue since July 2026 · Proposed COD September 2028

BA: MISOISO/RTO: MISONERC: MRORC: MISO

150 MW

Capacity

0

Components

3 months

In Queue

—

IA Status

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 2m

Pre-Study0%
Queue EntryJul 9, 2026

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-09-30

About

MISO-S1179 is a proposed 150 MW battery energy storage development project located in Portage County, Wisconsin. The project is listed in the interconnection queue of the Midcontinent Independent System Operator (MISO) and would connect to the transmission system at the Plover point of interconnection. The transmission owner for the interconnection is American Transmission Company. No developer or project name has been publicly identified in the queue data.

The project entered the MISO interconnection queue on July 9, 2026, and its status is active. It has a proposed commercial operation date of September 30, 2028. The queue record lists the service type as SIS, and the project is classified as a standalone storage facility using battery storage technology. The available data does not report the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

WI

County

Portage

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

AMERICAN TRANSMISSION COMPANY

Entity

MISO

Service Type

SIS

Point of Interconnection

Plover

Data Source

Live · MISO

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MINN.HUB
Hub Confidence
HIGH
POI Substation
Plover

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-S1179
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.