Project MISO-S1149 — Project Summary

Queue ID
MISO-S1149
Capacity
80 MW
Technology
Other
Status
active
Location
IL
Region
MISO
Developer
—
IA Status
—

MISO-S1149

MISO-S1149BetaActiveMISOLive · MISO

80 MW generation in IL · In queue since February 2026 · Proposed COD August 2028

BA: PJMISO/RTO: MISONERC: SERCRC: MISO

80 MW

Capacity

0

Components

9 months

In Queue

—

IA Status

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 6m

Pre-Study0%
Queue EntryFeb 9, 2026

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-08-01

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

MISO-S1149 is a proposed 80 MW generation project in Illinois, located within the Midcontinent Independent System Operator (MISO) region. The project's technology is listed as "Other" in interconnection records, and no project name, county, or developer has been publicly identified. The proposed project would interconnect with the transmission system of Ameren Illinois.

The development project entered the MISO interconnection queue on February 9, 2026, and is currently listed with an active status. It has a proposed commercial operation date of August 1, 2028. The project's service type is designated as SIS. No interconnection agreement status has been reported, and the project is not currently linked to an existing operating plant in U.S. Energy Information Administration records.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • MISO queue source as of: Oct 25, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IL

County

—

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

AMEREN ILLINOIS

Entity

MISO

Service Type

SIS

Data Source

Live · MISO

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ILLINOIS.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.