Surplus; J1562
200 MW storage in Mississippi, AR · In queue since June 2025 · Proposed COD October 2027
200 MW
Capacity
1
Components
Battery
1y 5m
In Queue
—
IA Status
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 4m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-10-31
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 25, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Project entered MISO interconnection queue as S1100
Research sources and reasoning (0 recorded sources)
low confidence at research time
No source list recorded with this assessment.
Commercial operation date: Only LBNL queue data available with proposed COD of October 2027. No independent news or research sources found to validate or contradict this date.
Developer: LBNL filing shows no developer entity. Search queries returned no results identifying the project sponsor or operating company behind this battery storage project.
Status: LBNL status shows active queue position. Project entered MISO queue in June 2025, making it a very recent application with no public track record yet.
About
Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
MISO-S1100 is a proposed 200 MW battery storage project located in Mississippi County, Arkansas. The project is in the Midcontinent Independent System Operator (MISO) interconnection queue, having entered the queue on June 18, 2025. Entergy Arkansas, LLC is the utility associated with the project.
The project's point of interconnection (POI) is at the Blytheville I-55 substation, specifically the AECC Blytheville North 161.0kV connection. The project's interconnection service type is a System Impact Study (SIS). The project is currently listed as active in the MISO queue.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- MISO queue source as of: Oct 25, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
AR
County
Mississippi
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ENTERGY ARKANSAS
Entity
MISO
Service Type
—
Point of Interconnection
BLYTHEVILLE I-55 - AECC BLYTHEVILLE NORTH 161.0kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- ARKANSAS.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
IMPA Tell City Solar Park
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
IMPA Richmond 8 Solar Park
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
IMPA Frankton Solar Park
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
IMPA Peru Solar Park
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.