Surplus; J909
100 MW hybrid in Tangipahoa Parish, LA · In queue since January 2025 · Proposed COD August 2027
100 MW
Capacity
1
Components
Other
1y 4m
In Queue
—
IA Status
COD target: 2027
Total Duration
2y 7m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-08-31
MISO-S1076 is a proposed 100 MW generation project located in Tangipahoa Parish, Louisiana. The project, which utilizes an "Other" technology type, is interconnected with Entergy Louisiana, LLC. It is currently listed as active in the Midcontinent Independent System Operator (MISO) interconnection queue, with a queue entry date of January 7, 2025.
The project's point of interconnection (POI) is the Amite 115kV substation. The service type requested is a System Impact Study (SIS).
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
LA
County
Tangipahoa Parish
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ENTERGY LOUISIANA
Entity
MISO
Service Type
—
Point of Interconnection
Amite 115kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Hub Confidence
- UNKNOWN
- Nearest Node (Estimated)
- EES.AMITESO
- POI Substation
- Amite Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Surplus; J909Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.