Surplus; J1132 (MISO-S1070) — Project Summary

Queue ID
MISO-S1070
Capacity
40 MW
Technology
Battery
Status
active
Location
Union, IA
Region
MISO
Developer
—
IA Status
—

Surplus; J1132

MISO-S1070BetaActiveOtherBatteryMISOLBNL + Live

40 MW hybrid in Union, IA · Proposed COD August 2025

BA: MISOISO/RTO: MISONERC: MRORC: MISO

40 MW

Capacity

1

Components

Other

—

In Queue

—

IA Status

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Schedule

15 months past proposed COD

Pre-Study0%
Queue Entry

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-08-01

About

The proposed project designated "Surplus; J1132" (queue ID MISO-S1070) is a 40 MW battery storage development project located in Union County, Iowa. It is listed in the Midcontinent Independent System Operator (MISO) interconnection queue, where it holds an active status. The project is classified as a hybrid, with its technology described as a combination of "Other" and battery components. The submitted component data lists a single 40 MW component of the "Other" type. No developer has been identified in the available data.

The project's proposed point of interconnection is ROUNDHOUSEJ1, within the service territory of transmission owner ITC Midwest. Its proposed commercial operation date is August 1, 2025. The "Surplus" designation in the project's name suggests it may have been submitted through MISO's surplus interconnection service process, which allows additional generation or storage to use existing interconnection capacity. This is not confirmed by the data, however. The available data does not specify a queue entry date or the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IA

County

Union

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

ITC MIDWEST

Entity

MISO

Service Type

—

Point of Interconnection

ROUNDHOUSEJ1

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MINN.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Surplus; J1132
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.