Surplus; J758 (MISO-S1063) — Project Summary

Queue ID
MISO-S1063
Capacity
100 MW
Technology
Battery
Status
active
Location
Calhoun, MI
Region
MISO
Developer
—
IA Status
—

Surplus; J758

MISO-S1063BetaActiveOtherBatteryMISOLBNL + Live

100 MW hybrid in Calhoun, MI · In queue since August 2024 · Proposed COD September 2027

BA: MISOISO/RTO: MISONERC: RFCRC: MISO

100 MW

Capacity

1

Components

Other

2y 2m

In Queue

—

IA Status

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 1m

Pre-Study0%
Queue EntryAug 28, 2024

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-09-30

About

Surplus; J758 (queue ID MISO-S1063) is a proposed battery storage development project located in Calhoun County, Michigan. The project is classified as a hybrid, with technology listed as "Other" and "Battery." It has a total capacity of 100 MW. The data reports a single component designated "Other" at 100 MW, and no separate capacity figure is provided for the battery portion. The project's name indicates that it is a surplus interconnection request associated with queue position J758.

The project is in the interconnection queue of the Midcontinent Independent System Operator (MISO), where its status is listed as active. It entered the queue on August 28, 2024. The project would connect to the transmission system of the Michigan Electric Transmission Company (METC) at the Verona – Foundry 138 kV point of interconnection. Its proposed commercial operation date is September 30, 2027. The available data does not identify a developer or report the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD within window)
Cost overrun probability
Schedule slippage vs plan
Project Details

State

MI

County

Calhoun

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

METC

Entity

MISO

Service Type

—

Point of Interconnection

Verona - Foundry 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Curtailment risk by node
Weather + policy scenarios
Financial Forecast

Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

First-year DSCR
Cost overrun probability
Price + demand scenarios
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MICHIGAN.HUB
Hub Confidence
HIGH
POI Substation
Verona

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Surplus; J758