Surplus; Big Bend (MISO-S1054) — Project Summary

Queue ID
MISO-S1054
Capacity
550 MW
Technology
Wind
Status
active
Location
Cottonwood, MN
Region
MISO
Developer
—
IA Status
—

Surplus; Big Bend

MISO-S1054BetaActiveWindOtherMISOLBNL + Live

550 MW hybrid in Cottonwood, MN · In queue since July 2024 · Proposed COD October 2027

BA: MISOISO/RTO: MISONERC: MRORC: MISO

550 MW

Capacity

1

Components

Wind

2y 4m

In Queue

—

IA Status

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 3m

Pre-Study0%
Queue EntryJul 19, 2024

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-10-30

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Oct 30, 2027
From queue filing
Developer in saved assessment
Apex Clean Energy
Sources agreed at research time
Status at research time
Active
Active in the MISO queue (surplus interconnection request). Apex has announced agreements with Great River Energy (Jan 2025), and the MN PUC approved Big Bend Wind site permits in Aug 2022. No construction start has been found.
Financing
Not recorded

Milestones in this assessment

Permit approvedAug 2022Latest in this assessment

MN PUC approved site permits and transmission routes for the Big Bend Wind project (and Red Rock) in southwest Minnesota.

mprnews.org
Research sources and reasoning (3 recorded sources)

medium confidence at research time

  1. windtech-international.com/projects-and-contracts/apex-clean-energy-secures-agreements-for-300-mw-big-bend-wind-project-in-minnesota
  2. mprnews.org/story/2022/08/25/puc-approves-site-permits-for-solar-wind-hybrid-projects-in-sw-minn
  3. interconnection.fyi/project/miso-s1054

Commercial operation date: The only COD in the evidence is the LBNL proposed date of 2027-10-30, and the search aggregator pages just repeat it. No developer or press source gives a different target date.

Developer: The LBNL developer field is blank, so there is nothing to conflict with. The Windtech International article (Jan 2025) names Apex Clean Energy as developer and seller of the Big Bend wind project, which has a PPA with Great River Energy.

Status: LBNL and the aggregator listings all show 'active', and no source shows withdrawal, suspension or construction. The project appears to have offtake and permits, but the evidence doesn't confirm an executed IA or a groundbreaking.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Surplus; Big Bend development project is a proposed 550 MW hybrid wind and "other" energy project located in Cottonwood County, Minnesota. The project consists of 550 MW of wind generation. It is listed in the Midcontinent Independent System Operator (MISO) interconnection queue as entry S1054, with a queue entry date of July 19, 2024, and a proposed commercial operation date of October 30, 2027. The point of interconnection is the Lakefield Junction 345kV substation. Northern States Power Company is the interconnecting utility.

The Surplus; Big Bend project has been the subject of recent news coverage, with two articles categorized as regulatory matters.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • MISO queue source as of: Oct 25, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

MN

County

Cottonwood

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

NORTHERN STATES POWER COMPANY

Entity

MISO

Service Type

—

Point of Interconnection

Lakefield Junction 345kV

Data Source

LBNL + Live

DeveloperApex Clean EnergyWindtech International · 2025-01-24
TransactionPPAWindtech International · 2025-01-24
OfftakerGreat River EnergyWindtech International · 2025-01-24
PPA structurePhysicalWindtech International · 2025-01-24
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MINN.HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
ALTW.LKFLD.IPL
POI Substation
Lakefield Junction Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.