Surplus; Big Bend
550 MW hybrid in Cottonwood, MN · In queue since July 2024 · Proposed COD October 2027
550 MW
Capacity
1
Components
Wind
2y 4m
In Queue
—
IA Status
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 3m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-10-30
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
MN PUC approved site permits and transmission routes for the Big Bend Wind project (and Red Rock) in southwest Minnesota.
mprnews.orgResearch sources and reasoning (3 recorded sources)
medium confidence at research time
- windtech-international.com/projects-and-contracts/apex-clean-energy-secures-agreements-for-300-mw-big-bend-wind-project-in-minnesota
- mprnews.org/story/2022/08/25/puc-approves-site-permits-for-solar-wind-hybrid-projects-in-sw-minn
- interconnection.fyi/project/miso-s1054
Commercial operation date: The only COD in the evidence is the LBNL proposed date of 2027-10-30, and the search aggregator pages just repeat it. No developer or press source gives a different target date.
Developer: The LBNL developer field is blank, so there is nothing to conflict with. The Windtech International article (Jan 2025) names Apex Clean Energy as developer and seller of the Big Bend wind project, which has a PPA with Great River Energy.
Status: LBNL and the aggregator listings all show 'active', and no source shows withdrawal, suspension or construction. The project appears to have offtake and permits, but the evidence doesn't confirm an executed IA or a groundbreaking.
About
Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Surplus; Big Bend development project is a proposed 550 MW hybrid wind and "other" energy project located in Cottonwood County, Minnesota. The project consists of 550 MW of wind generation. It is listed in the Midcontinent Independent System Operator (MISO) interconnection queue as entry S1054, with a queue entry date of July 19, 2024, and a proposed commercial operation date of October 30, 2027. The point of interconnection is the Lakefield Junction 345kV substation. Northern States Power Company is the interconnecting utility.
The Surplus; Big Bend project has been the subject of recent news coverage, with two articles categorized as regulatory matters.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- MISO queue source as of: Oct 25, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MN
County
Cottonwood
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
NORTHERN STATES POWER COMPANY
Entity
MISO
Service Type
—
Point of Interconnection
Lakefield Junction 345kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- ALTW.LKFLD.IPL
- POI Substation
- Lakefield Junction Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesMax 4 Wind
Data tables and metrics from the InfraSure database.
FPL Energy Oliver Wind II LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Wind queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Big Bend
Data-driven briefing on Big Bend — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.