Surplus; Shelby (MISO-S1052) — Project Summary

Queue ID
MISO-S1052
Capacity
150 MW
Technology
Solar
Status
active
Location
Cumberland, IL
Region
MISO
Developer
—
IA Status
—

Surplus; Shelby

MISO-S1052BetaActiveSolarOtherMISOLBNL + Live

150 MW hybrid in Cumberland, IL · In queue since June 2024 · Proposed COD September 2026

BA: PJMISO/RTO: MISONERC: SERCRC: MISO

150 MW

Capacity

1

Components

Solar

2y 5m

In Queue

—

IA Status

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 3m

Schedule

2 months past proposed COD

Pre-Study0%
Queue EntryJun 14, 2024

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-09-22

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 25, 2026 queue source. See the queue record for reported project facts.

Research COD
Sep 22, 2026
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — queue position maintained as of June 2024, no public construction or permitting announcements
Financing
Not recorded

Milestones in this assessment

IA executedJun 14, 2024Latest in this assessment

Project entered MISO queue as S1052

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of September 2026. No independent news or press releases found to validate or contradict this date.

Developer: LBNL filing shows no developer entity. No press releases, corporate announcements, or news coverage found identifying the project sponsor or operating company.

Status: LBNL status shows active queue position entered June 2024. Absence of news coverage suggests early-stage development with no major milestones announced yet.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Surplus; Shelby development project is a proposed 150 MW hybrid solar project located in Cumberland County, Illinois. Interconnecting to the Ameren Illinois utility, the project consists of 150 MW of solar generation.

The project is listed in the MISO interconnection queue as entry S1052, with a queue entry date of June 14, 2024, and a proposed commercial operation date of September 22, 2026.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • MISO queue source as of: Oct 25, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IL

County

Cumberland

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

AMEREN ILLINOIS

Entity

MISO

Service Type

—

Point of Interconnection

Neoga South 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ILLINOIS.HUB
Hub Confidence
HIGH
POI Substation
South

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.