Surplus; J1314
100 MW hybrid in Polk, WI · In queue since September 2022 · Proposed COD June 2025
100 MW
Capacity
1
Components
Other
4y 1m
In Queue
—
IA Status
COD target: 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 9m
Schedule
16 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-06-30
Surplus; J1314 (queue ID MISO-S1039) is a proposed 100 MW battery energy storage development project located in Polk County, Wisconsin. The project is classified as a hybrid, with listed technologies of battery storage and an "Other" category. Its single reported component is designated "Other," with a capacity of 100 MW. No developer is identified in the available data. The project's name and queue designation suggest it was submitted as a surplus interconnection request, a mechanism that allows additional capacity to use interconnection service already held by an existing facility. The proposed point of interconnection is the Apple River 161 kV substation.
The project is in the interconnection queue administered by the Midcontinent Independent System Operator (MISO), which it entered on September 1, 2022. Its status is listed as active, and its proposed commercial operation date is June 30, 2025. The available data does not report the status of an interconnection agreement, does not link the project to an existing operating plant in EIA records, and does not indicate any recent news coverage.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
WI
County
Polk
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
—
Entity
MISO
Service Type
—
Point of Interconnection
Apple River 161kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- POI Substation
- Eagle River
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Surplus; J1314Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.