MISO-S1034
25 MW generation in Dodge, WI · In queue since August 2022 · Proposed COD June 2023
25 MW
Capacity
0
Components
4y 2m
In Queue
—
IA Status
COD target: 2023
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
10 months
Schedule
41 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-06-06
MISO-S1034 is a proposed 25 MW generation development project located in Dodge County, Wisconsin, within the Midcontinent Independent System Operator (MISO) region. The project's technology is classified as "Other" in the interconnection queue data, and no developer or project name has been publicly identified. The project is proposed to connect to the transmission system at the North Beaver Dam 69kV substation (Bus 698222), within the service territory of American Transmission Company.
The project entered the MISO interconnection queue on August 15, 2022, and remains in active status. It is being evaluated under a Surplus Interconnection Service (SIS) request. The proposed commercial operation date was June 6, 2023, a date that has since passed while the project remains in active queue status. The available data does not indicate the status of an interconnection agreement for the project.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
WI
County
Dodge
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMERICAN TRANSMISSION COMPANY
Entity
MISO
Service Type
SIS
Point of Interconnection
North Beaver Dam 69kV - Bus 698222
Data Source
Live · MISO
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- ALTE.BVRDAM
- POI Substation
- North Beaver Dam
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.