Surplus; J1188 (MISO-S1025) — Project Summary

Queue ID
MISO-S1025
Capacity
25 MW
Technology
Battery
Status
active
Location
Rock, WI
Region
MISO
Developer
—
IA Status
—

Surplus; J1188

MISO-S1025BetaActiveOtherBatteryMISOLBNL + Live

25 MW hybrid in Rock, WI · In queue since May 2022 · Proposed COD June 2022

BA: MISOISO/RTO: MISONERC: MRORC: MISO

25 MW

Capacity

1

Components

Other

4y 5m

In Queue

—

IA Status

COD target: 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1 month

Schedule

54 months past proposed COD

Pre-Study0%
Queue EntryMay 16, 2022

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-06-01

About

The proposed project identified as "Surplus; J1188" (queue ID MISO-S1025) is a 25 MW battery storage development project in Rock County, Wisconsin. It is listed as a hybrid project, with technology categories of "Other" and "Battery." The single reported component is a 25 MW "Other" component, and no separate capacity is given for the battery portion. The project's name indicates it was submitted as a surplus interconnection request associated with queue position J1188. The proposed point of interconnection is the Sheepskin 69kV substation, and American Transmission Company is the transmission owner.

The project is in the interconnection queue of the Midcontinent Independent System Operator (MISO), where it holds active status. It entered the queue on May 16, 2022, with a proposed commercial operation date of June 1, 2022, only about two weeks after the queue entry date. The available data does not report the status of an interconnection agreement, and the project is not linked to an existing operating plant in EIA records.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

WI

County

Rock

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

AMERICAN TRANSMISSION COMPANY

Entity

MISO

Service Type

—

Point of Interconnection

Sheepskin 69kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MINN.HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
ALTE.NROCK
POI Substation
SHEEPSKIN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Surplus; J1188
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.