Surplus; Pine River Solar (MISO-S1021) — Project Summary

Queue ID
MISO-S1021
Capacity
80 MW
Technology
Solar
Status
active
Location
Gratiot, MI
Region
MISO
Developer
—
IA Status
IA Executed

Surplus; Pine River Solar

MISO-S1021BetaActiveSolarOtherMISOLBNL + Live

80 MW hybrid in Gratiot, MI · In queue since April 2022 · Proposed COD September 2023

BA: MISOISO/RTO: MISONERC: RFCRC: MISO

80 MW

Capacity

1

Components

Solar

4y 6m

In Queue

IA Executed

IA Phase

Signed May 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

1 month

IA → COD

1y 4m

Total Duration

1 month

Schedule

38 months past proposed COD

Construction75%
Queue EntryApr 25, 2022

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection AgreementMay 17, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Done

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2023-09-01

About

Surplus; Pine River Solar (queue ID MISO-S1021) is a proposed solar development project located in Gratiot County, Michigan, within the Midcontinent Independent System Operator (MISO) region. The project has a total capacity of 80 MW and is classified as a hybrid project. Its technology details list both solar and "other" components, though the only component with a specified capacity is 80 MW of solar. The transmission owner is the Michigan Electric Transmission Company (METC), and the project's point of interconnection is the Luce Substation.

The project entered the MISO interconnection queue on April 25, 2022, as a surplus interconnection request, and its queue status is active. An interconnection agreement (IA) was executed on May 17, 2022. The proposed commercial operation date was September 1, 2023. The project is linked to an existing operating plant in U.S. Energy Information Administration (EIA) records, the Pine River Solar Park (EIA plant ID 67941), with a match confidence of 0.81.

Generated from interconnection queue and public data sources

Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

MI

County

Gratiot

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

METC

Entity

MISO

Service Type

—

Point of Interconnection

Luce Substation

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MICHIGAN.HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
CONS.PNRVR.SOL

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Surplus; Pine River Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.