Surplus; J986 (MISO-S1018) — Project Summary

Queue ID
MISO-S1018
Capacity
75 MW
Technology
Battery
Status
active
Location
—
Region
MISO
Developer
—
IA Status
—

Surplus; J986

MISO-S1018BetaActiveOtherBatteryMISOLBNL + Live

75 MW hybrid in — · In queue since April 2022 · Proposed COD June 2022

ISO/RTO: MISO

75 MW

Capacity

1

Components

Other

4y 6m

In Queue

—

IA Status

COD target: 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2 months

Schedule

54 months past proposed COD

Pre-Study0%
Queue EntryApr 20, 2022

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-06-01

About

Surplus; J986 (queue ID MISO-S1018) is a proposed battery development project in the Midcontinent Independent System Operator (MISO) interconnection queue. The project is classified as a hybrid, with technology components listed as "Other" and "Battery," and has a total capacity of 75 MW. The component breakdown attributes the full 75 MW to the "Other" category, and no separate capacity figure is given for the battery component. The data does not specify a developer or county.

The project entered the MISO queue on April 20, 2022, and is listed as active. It proposes to interconnect at the 7 Mile Creek 138kV point of interconnection, with American Transmission Company as the transmission owner. The proposed commercial operation date was June 1, 2022, less than two months after the queue entry date. Its name and "S" queue prefix suggest a surplus interconnection request associated with an existing generator interconnection position (J986). The status of its interconnection agreement is not specified in the available data.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

—

County

—

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

AMERICAN TRANSMISSION COMPANY

Entity

MISO

Service Type

—

Point of Interconnection

7 Mile Creek 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Hub Confidence
UNKNOWN
POI Substation
Nine Mile Creek Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Surplus; J986
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.