Surplus; J947 (MISO-S1017) — Project Summary

Queue ID
MISO-S1017
Capacity
100 MW
Technology
Battery
Status
active
Location
—
Region
MISO
Developer
—
IA Status
—

Surplus; J947

MISO-S1017BetaActiveOtherBatteryMISOLBNL + Live

100 MW hybrid in — · In queue since April 2022 · Proposed COD June 2023

ISO/RTO: MISO

100 MW

Capacity

1

Components

Other

4y 6m

In Queue

—

IA Status

COD target: 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 2m

Schedule

41 months past proposed COD

Pre-Study0%
Queue EntryApr 11, 2022

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-06-01

About

MISO-S1017, listed in the queue under the name "Surplus; J947," is a proposed battery storage development project in the Midcontinent Independent System Operator (MISO) region. The project is classified as a hybrid, with technology details listing both "Other" and battery components. Its total capacity is 100 MW, all of which is recorded under a single component designated "Other." The project would interconnect at the Tennyson 138kV point of interconnection, within the transmission system of American Transmission Company. The data does not identify the county, state, or developer.

The proposed project entered the MISO interconnection queue on April 11, 2022, and currently holds an active status. Its proposed commercial operation date was June 1, 2023. The "Surplus" designation in its name suggests a surplus interconnection service request, a mechanism that allows additional generation or storage to use unused capacity at an existing interconnection point. The available data does not specify the status of an interconnection agreement for the project.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

—

County

—

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

AMERICAN TRANSMISSION COMPANY

Entity

MISO

Service Type

—

Point of Interconnection

Tennyson 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Hub Confidence
UNKNOWN
Nearest Node (Estimated)
ALTE.GRANTCTY
POI Substation
Tennyson

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.