Surplus; Merricourt Solar (MISO-S1014) — Project Summary

Queue ID
MISO-S1014
Capacity
49.9 MW
Technology
Solar
Status
active
Location
—
Region
MISO
Developer
—
IA Status
—

Surplus; Merricourt Solar

MISO-S1014BetaActiveSolarOtherMISOLBNL + Live

49.9 MW hybrid in — · In queue since March 2022 · Proposed COD October 2025

ISO/RTO: MISO

49.9 MW

Capacity

1

Components

Solar

4y 7m

In Queue

—

IA Status

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 7m

Schedule

12 months past proposed COD

Pre-Study0%
Queue EntryMar 9, 2022

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-10-31

About

Surplus; Merricourt Solar (queue ID MISO-S1014) is a proposed solar development project in the interconnection queue of the Midcontinent Independent System Operator (MISO). It is classified as a hybrid project, with technology listed as solar and "other," and a total capacity of 49.9 megawatts (MW), all attributed to its solar component. The project's transmission owner is Montana-Dakota Utilities Co., and its point of interconnection is the Merricourt Wind 230 kV facility. The available data does not identify the project's developer or its county and state.

The project entered the MISO queue on March 9, 2022, and remains active. Its proposed commercial operation date is October 31, 2025. The provided data does not specify the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

—

County

—

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

MONTANA-DAKOTA UTILITIES CO.

Entity

MISO

Service Type

—

Point of Interconnection

Merricourt Wind 230kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Hub Confidence
UNKNOWN
Nearest Node (Estimated)
MDU.MERRICOURT
POI Substation
Merricourt Windfarm Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Surplus; Merricourt Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.