Surplus; Pleasant Valley Peaker
258.92 MW hybrid in — · In queue since August 2021 · Proposed COD October 2023
258.92 MW
Capacity
1
Components
Wind
5y 2m
In Queue
—
IA Status
COD target: 2023
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 2m
Schedule
37 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-10-01
Surplus; Pleasant Valley Peaker (queue ID MISO-S1009) is a proposed hybrid development project in the Midcontinent Independent System Operator (MISO) interconnection queue. The project has a total capacity of 258.92 MW. Its primary technology is listed as wind, with technology details indicating wind and an additional "other" component. The only individual capacity reported is a 258.92 MW wind component. The interconnecting utility is Great River Energy, and the project's proposed point of interconnection is the Pleasant Valley 161 kV Substation. The provided data does not identify a developer, county, or state.
The project entered the MISO queue on August 17, 2021, and its status remains active. Its proposed commercial operation date was October 1, 2023, a date that has since passed while the project continues to be listed as active. The available data does not report the status of an interconnection agreement. The "Surplus" designation in the project name suggests it may be a surplus interconnection request at an existing facility, but the data provides no link to an operating plant.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
—
County
—
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
GREAT RIVER ENERGY
Entity
MISO
Service Type
—
Point of Interconnection
Pleasant Valley 161kV Substation
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Hub Confidence
- UNKNOWN
- POI Substation
- Pleasant Valley Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Surplus; Pleasant Valley PeakerForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.