Surplus; J903 (MISO-S1004) — Project Summary

Queue ID
MISO-S1004
Capacity
30 MW
Technology
Battery
Status
active
Location
—
Region
MISO
Developer
—
IA Status
—

Surplus; J903

MISO-S1004BetaActiveOtherBatteryMISOLBNL + Live

30 MW hybrid in — · In queue since October 2020

ISO/RTO: MISO

30 MW

Capacity

1

Components

Other

6 years

In Queue

—

IA Status

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6 years

Pre-Study0%
Queue EntryOct 28, 2020

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Commercial operation date not yet determined

About

"Surplus; J903" (queue ID MISO-S1004) is a proposed battery development project in the Midcontinent Independent System Operator (MISO) interconnection queue. The project is classified as a hybrid, with technology listed as "Other" and "Battery." It has a total capacity of 30 megawatts (MW). The data identifies a single 30 MW component designated as "Other" and does not give a separate capacity for the battery portion. The "Surplus" designation in the project name suggests a MISO surplus interconnection service request, which allows new generation to use unused interconnection capacity at an existing facility. The data does not specify the location, county, state or developer.

The project entered the MISO queue on October 28, 2020, and its status is listed as active. The data does not include a proposed commercial operation date or the status of an interconnection agreement. No link to an existing operating plant in Energy Information Administration (EIA) records is indicated, and no recent news coverage of the project is noted.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

—

County

—

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

—

Entity

MISO

Service Type

—

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Surplus; J903
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.