Surplus; Gibson Generating Station
7.5 MW hybrid in — · In queue since June 2020
7.5 MW
Capacity
1
Components
Other
6y 4m
In Queue
—
IA Status
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6y 4m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Commercial operation date not yet determined
Surplus; Gibson Generating Station (queue ID MISO-S1001) is a proposed hybrid development project in the Midcontinent Independent System Operator (MISO) interconnection queue. The project is classified primarily as a battery storage project, with technology details listing both "Other" and "Battery" components. Its total proposed capacity is 7.5 MW, and the single reported component, categorized as "Other," accounts for the full 7.5 MW. The data does not give separate capacity figures for the battery portion. The project name suggests a surplus interconnection request associated with the Gibson Generating Station, but the data does not specify a county, state, or developer.
The project entered the MISO queue on June 25, 2020, and its status is listed as active. The data includes no proposed commercial operation date, no interconnection agreement status, and no link to an existing plant in U.S. Energy Information Administration (EIA) records.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
—
County
—
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
—
Entity
MISO
Service Type
—
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Surplus; Gibson Generating StationForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.