MISO-R5096
— generation in Mississippi · In queue since March 2026 · Proposed COD July 2027
—
Capacity
0
Components
7 months
In Queue
—
IA Status
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
1y 4m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-07-30
MISO-R5096 is a proposed generation project in Mississippi County, within the service territory of Entergy Arkansas, LLC. The project's technology is listed as "Other," and no developer or project name has been disclosed in the available queue data. It would connect to the grid at the AECC Dell East – Blytheville Elm St 161 kV point of interconnection. Total proposed capacity is not specified in the available data.
The project is in the interconnection queue of the Midcontinent Independent System Operator (MISO), which it entered on March 17, 2026, and its status is active. The project has requested Energy Resource Interconnection Service (ERIS), and the associated transmission owner is listed as Entergy Arkansas, LLC (EATO). The proposed commercial operation date is July 30, 2027. The available data does not indicate the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
—
County
Mississippi
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ENTERGY ARKANSAS, LLC EATO
Entity
MISO
Service Type
ERIS
Point of Interconnection
AECC Dell East - Blytheville Elm St 161 kV
Data Source
Live · MISO
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.