Project MISO-R5093 — Project Summary

Queue ID
MISO-R5093
Capacity
200 MW
Technology
Battery
Status
active
Location
St. James, LA
Region
MISO
Developer
—
IA Status
—

MISO-R5093

MISO-R5093BetaActiveBattery StorageMISOLive · MISO

200 MW storage in St. James, LA · In queue since October 2025 · Proposed COD April 2023

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

200 MW

Capacity

0

Components

1y 1m

In Queue

—

IA Status

COD target: 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 1m

Schedule

45 months past proposed COD

Pre-Study0%
Queue EntryOct 14, 2025

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-04-01

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

MISO-R5093 is a proposed battery energy storage development project in St. James County, Louisiana. The project would have a total capacity of 200 MW and is classified as a storage project using battery storage technology. No developer has been identified in the available queue data. The project would connect to the transmission system of Entergy Louisiana, LLC (ELTO) at the Vacherie point of interconnection.

The project is listed as active in the interconnection queue of the Midcontinent Independent System Operator (MISO). It entered the queue on October 14, 2025, and has requested Network Resource Interconnection Service (NRIS). The queue data lists a proposed commercial operation date of April 1, 2023, which precedes the project's queue entry date. The available data does not report the status of an interconnection agreement.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • MISO queue source as of: Oct 25, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

LA

County

St. James

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

ENTERGY LOUISIANA, LLC ELTO

Entity

MISO

Service Type

NRIS

Point of Interconnection

VACHERIE

Data Source

Live · MISO

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
LOUISIANA.HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
EES.STJAMES
POI Substation
Vacherie Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.