MISO-R5079
— generation in — · In queue since November 2025 · Proposed COD April 2027
—
Capacity
0
Components
11 months
In Queue
—
IA Status
COD target: 2027
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
1y 5m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-04-01
MISO-R5079 is a proposed generation project in the interconnection queue of the Midcontinent Independent System Operator (MISO). The project is classified under the "Other" technology category, and the available data does not specify its fuel type or total capacity. Its interconnecting transmission owner is Entergy Louisiana, LLC (ELTO), which places it within Entergy Louisiana's service territory. The data does not identify the county, the developer, or a formal project name, so the project is referred to by its queue identifier.
The project entered the MISO queue on November 25, 2025, and its queue status is active. It has requested Network Resource Interconnection Service (NRIS), which would allow its output to serve network load as a designated network resource. The proposed commercial operation date is April 1, 2027. The data does not report the status of an interconnection agreement. The project is not linked to an existing operating plant in EIA records, and no news coverage is associated with it.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
—
County
—
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
ENTERGY LOUISIANA, LLC ELTO
Entity
MISO
Service Type
NRIS
Data Source
Live · MISO
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project MISO-R5079Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.