Replacing 55 MW with 29 MW Natural Gas/Fuel Oil; Blue Lake Unit 3 (MISO-R1051) — Project Summary

Queue ID
MISO-R1051
Capacity
55 MW
Technology
Gas
Status
active
Location
Scott, MN
Region
MISO
Developer
—
IA Status
—

Replacing 55 MW with 29 MW Natural Gas/Fuel Oil; Blue Lake Unit 3

MISO-R1051BetaActiveGasOtherMISOLBNL + Live

55 MW hybrid in Scott, MN · In queue since May 2024 · Proposed COD April 2025

BA: MISOISO/RTO: MISONERC: MRORC: MISO

55 MW

Capacity

1

Components

Gas

2y 5m

In Queue

—

IA Status

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

11 months

Schedule

19 months past proposed COD

Pre-Study0%
Queue EntryMay 16, 2024

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-04-01

About

The proposed project "Replacing 55 MW with 29 MW Natural Gas/Fuel Oil; Blue Lake Unit 3," identified in the Midcontinent Independent System Operator (MISO) interconnection queue as MISO-R1051, is a gas-fired development project located in Scott County, Minnesota. The queue lists the project as a hybrid, with technology categories of gas and other. Its single listed component is 55 MW of gas generation, and the project's total capacity is recorded as 55 MW. As the project name indicates, the proposal involves replacing 55 MW of capacity at Blue Lake Unit 3 with 29 MW of natural gas/fuel oil generation. The developer is not identified in the available data.

The project entered the MISO queue on May 16, 2024, and holds an active status. It is proposed to interconnect at the Blue Lake 115 kV point of interconnection under Network Resource Interconnection Service (NRIS). The project has a proposed commercial operation date of April 1, 2025. The available data does not indicate the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

MN

County

Scott

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

—

Entity

MISO

Service Type

NRIS

Point of Interconnection

Blue Lake 115kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MINN.HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
NSP.BLUE_LK_09
POI Substation
Blue Lake Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.