Replacing 303.5 MW BESS with 303.5 MW COAL; Edgewater Unit 5
303.5 MW hybrid in Sheboygan, WI · In queue since December 2024 · Proposed COD June 2025
303.5 MW
Capacity
1
Components
Other
1y 10m
In Queue
—
IA Status
COD target: 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
6 months
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-06-01
MISO-R1049, listed in the queue as "Replacing 303.5 MW BESS with 303.5 MW COAL; Edgewater Unit 5," is a proposed development project in Sheboygan County, Wisconsin, within the Midcontinent Independent System Operator (MISO) region. The queue record classifies it as a hybrid project totaling 303.5 MW, with technology listed as coal and "Other." Its single reported component is 303.5 MW categorized as "Other." The project name indicates it would replace a previously proposed 303.5 MW battery energy storage system (BESS) with 303.5 MW of coal capacity associated with Edgewater Unit 5. No developer is identified in the available data.
The project entered the MISO interconnection queue on December 24, 2024, and its status is active. It has requested Network Resource Interconnection Service (NRIS) and would connect at the Edgewater 345 kV point of interconnection, with American Transmission Company as the transmission owner. The proposed commercial operation date is June 1, 2025. The available data does not report the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
WI
County
Sheboygan
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
AMERICAN TRANSMISSION COMPANY
Entity
MISO
Service Type
NRIS
Point of Interconnection
Edgewater 345kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- ALTE.EDG.ESR
- POI Substation
- Edgewater Station
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Replacing 303.5 MW BESS with 303.5 MW COAL; Edgewater Unit 5Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.