Replacing 864 MW of coal with Natural Gas Generators; Castle Bluff (MISO-R1047) — Project Summary

Queue ID
MISO-R1047
Capacity
824 MW
Technology
Gas
Status
active
Location
St. Louis, MO
Region
MISO
Developer
—
IA Status
—

Replacing 864 MW of coal with Natural Gas Generators; Castle Bluff

MISO-R1047BetaActiveGasOtherMISOLBNL + Live

824 MW hybrid in St. Louis, MO · In queue since May 2024 · Proposed COD December 2025

BA: AECIISO/RTO: MISONERC: SERCRC: MISO

824 MW

Capacity

1

Components

Gas

2y 5m

In Queue

—

IA Status

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 7m

Schedule

10 months past proposed COD

Pre-Study0%
Queue EntryMay 28, 2024

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-31

Cross-source intelligence
Beta
Low confidence·2 sources·as of 2026-10-25
Expected COD
2025-12-31
From queue filing
Developer
Ameren Missouri
Status
Active
Active in the MISO queue with no IA on file. Ameren describes Castle Bluff as 'upcoming', so it is not yet operating, and no construction or commissioning milestones were found.
Financing
Unannounced
About

Castle Bluff, identified in the Midcontinent Independent System Operator (MISO) interconnection queue as MISO-R1047, is a proposed natural gas generation project in St. Louis County, Missouri. As described in its queue entry, the project would replace 864 MW of coal-fired generation with natural gas generators. It has a total proposed capacity of 824 MW, all of it gas-fired. The queue lists the project as a hybrid with technology categories of gas and "other," but the gas units are its only specified component. The associated utility is Ameren Missouri.

The project entered the MISO queue on May 28, 2024, and its status is active. It would connect to the grid at the Meramec Substation at 138 kV. The project has requested Network Resource Interconnection Service (NRIS). Its proposed commercial operation date is December 31, 2025. The available data does not indicate the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

MO

County

St. Louis

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

AMEREN MISSOURI

Entity

MISO

Service Type

NRIS

Point of Interconnection

Meramec Substation 138kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
ILLINOIS.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.