Replacing 258MW ERIS gas/oil with 237MW ERIS Natural Gas/oil; Wheaton 1-4 (MISO-R1045) — Project Summary

Queue ID
MISO-R1045
Capacity
237 MW
Technology
Gas
Status
active
Location
Chippewa, MN
Region
MISO
Developer
—
IA Status
—

Replacing 258MW ERIS gas/oil with 237MW ERIS Natural Gas/oil; Wheaton 1-4

MISO-R1045BetaActiveGasOtherMISOLBNL + Live

237 MW hybrid in Chippewa, MN · In queue since March 2024 · Proposed COD June 2025

BA: MISOISO/RTO: MISONERC: MRORC: MISO

237 MW

Capacity

1

Components

Gas

2y 7m

In Queue

—

IA Status

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 3m

Schedule

17 months past proposed COD

Pre-Study0%
Queue EntryMar 1, 2024

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-06-03

About

MISO-R1045 is a proposed natural gas development project in Chippewa County, Minnesota, within the Midcontinent Independent System Operator (MISO) region. The project is described as replacing 258 MW of Energy Resource Interconnection Service (ERIS) gas/oil capacity with 237 MW of ERIS natural gas/oil capacity at Wheaton Units 1–4. The total proposed capacity is 237 MW, all of it a single gas component. The queue entry classifies the project as a hybrid, with technology details listed as "Gas" and "Other." The associated utility is Northern States Power Company.

The project entered the MISO interconnection queue on March 1, 2024, under queue ID MISO-R1045, and its status is active. It proposes to interconnect at the Wheaton 161 kV point of interconnection. The service type listed in the queue data is Network Resource Interconnection Service (NRIS), even though the project description refers to ERIS capacity. The proposed commercial operation date is June 3, 2025. The available data does not indicate the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

MN

County

Chippewa

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

NORTHERN STATES POWER COMPANY

Entity

MISO

Service Type

NRIS

Point of Interconnection

Wheaton 161kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MINN.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.