Replacing 258MW ERIS gas/oil with 237MW ERIS Natural Gas/oil; Wheaton 1-4
237 MW hybrid in Chippewa, MN · In queue since March 2024 · Proposed COD June 2025
237 MW
Capacity
1
Components
Gas
2y 7m
In Queue
—
IA Status
COD target: 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
1y 3m
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-06-03
MISO-R1045 is a proposed natural gas development project in Chippewa County, Minnesota, within the Midcontinent Independent System Operator (MISO) region. The project is described as replacing 258 MW of Energy Resource Interconnection Service (ERIS) gas/oil capacity with 237 MW of ERIS natural gas/oil capacity at Wheaton Units 1–4. The total proposed capacity is 237 MW, all of it a single gas component. The queue entry classifies the project as a hybrid, with technology details listed as "Gas" and "Other." The associated utility is Northern States Power Company.
The project entered the MISO interconnection queue on March 1, 2024, under queue ID MISO-R1045, and its status is active. It proposes to interconnect at the Wheaton 161 kV point of interconnection. The service type listed in the queue data is Network Resource Interconnection Service (NRIS), even though the project description refers to ERIS capacity. The proposed commercial operation date is June 3, 2025. The available data does not indicate the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MN
County
Chippewa
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
NORTHERN STATES POWER COMPANY
Entity
MISO
Service Type
NRIS
Point of Interconnection
Wheaton 161kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Replacing 258MW ERIS gas/oil with 237MW ERIS Natural Gas/oil; Wheaton 1-4Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.