Replacing 220 MW of coal generation with BESS; Trenton Channel 9 (MISO-R1041) — Project Summary

Queue ID
MISO-R1041
Capacity
220 MW
Technology
Battery
Status
active
Location
Wayne, MI
Region
MISO
Developer
—
IA Status
—

Replacing 220 MW of coal generation with BESS; Trenton Channel 9

MISO-R1041BetaActiveOtherBatteryMISOLBNL + Live

220 MW hybrid in Wayne, MI · In queue since October 2023 · Proposed COD May 2025

BA: MISOISO/RTO: MISONERC: RFCRC: MISO

220 MW

Capacity

1

Components

Other

3 years

In Queue

—

IA Status

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 7m

Schedule

17 months past proposed COD

Pre-Study0%
Queue EntryOct 11, 2023

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-05-31

About

The proposed project identified as "Replacing 220 MW of coal generation with BESS; Trenton Channel 9" (queue ID MISO-R1041) is a battery energy storage development project in Wayne County, Michigan. The project is listed as a hybrid, with technology entries of "Battery" and "Other." Its total capacity is 220 MW, recorded as a single 220 MW component classified as "Other." As the project name indicates, the battery energy storage system (BESS) is intended to replace 220 MW of coal-fired generation at the Trenton Channel site. No developer is identified in the available data.

The project is in the Midcontinent Independent System Operator (MISO) interconnection queue, which it entered on October 11, 2023. Its status is active. It requests Network Resource Interconnection Service (NRIS) at the TCHPP Position JC 120kV point of interconnection, with METC as the transmission utility. The proposed commercial operation date is May 31, 2025. The available data does not specify the status of an interconnection agreement. The project is linked to an existing operating facility, the Trenton Channel Energy Center (EIA plant ID 67759), with a match confidence of 0.78.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

MI

County

Wayne

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

METC

Entity

MISO

Service Type

NRIS

Point of Interconnection

TCHPP Position JC 120kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MICHIGAN.HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
DECO.SLOES11
POI Substation
Trenton Channel Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.