Replacing 749 MW of coal generation with BESS; Campbell 3
749 MW hybrid in Ottawa, MI · In queue since November 2023 · Proposed COD March 2028
749 MW
Capacity
1
Components
Other
2y 11m
In Queue
—
IA Status
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 4m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-03-31
The proposed project identified in the MISO interconnection queue as "Replacing 749 MW of coal generation with BESS; Campbell 3" (queue ID MISO-R1040) is a battery energy storage development project located in Ottawa County, Michigan. As its name indicates, the project is intended to replace 749 MW of coal-fired generation associated with Campbell 3 with a battery energy storage system (BESS). The queue classifies it as a hybrid project with a total capacity of 749 MW and lists both "Other" and "Battery" technology designations. Its single recorded component is a 749 MW "Other" component. No developer is identified in the available data.
The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on November 9, 2023, and its status is active. It proposes to interconnect at the Campbell Substation at 345 kV, within the transmission system of METC, and has requested Network Resource Interconnection Service (NRIS). The proposed commercial operation date is March 31, 2028. The available data does not indicate the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MI
County
Ottawa
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
METC
Entity
MISO
Service Type
NRIS
Point of Interconnection
Campbell Substation 345kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MICHIGAN.HUB
- Hub Confidence
- HIGH
- POI Substation
- Campbell Junction Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Replacing 749 MW of coal generation with BESS; Campbell 3Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.