Replacing 749 MW of coal generation with BESS; Campbell 3 (MISO-R1040) — Project Summary

Queue ID
MISO-R1040
Capacity
749 MW
Technology
Battery
Status
active
Location
Ottawa, MI
Region
MISO
Developer
—
IA Status
—

Replacing 749 MW of coal generation with BESS; Campbell 3

MISO-R1040BetaActiveOtherBatteryMISOLBNL + Live

749 MW hybrid in Ottawa, MI · In queue since November 2023 · Proposed COD March 2028

BA: MISOISO/RTO: MISONERC: RFCRC: MISO

749 MW

Capacity

1

Components

Other

2y 11m

In Queue

—

IA Status

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 4m

Pre-Study0%
Queue EntryNov 9, 2023

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-31

Cross-source intelligence
Beta
Low confidence·2 sources·as of 2026-10-25
Expected COD
2028-03-31
From queue filing
Developer
—
Status
Active
Active in the MISO queue (queue date 2023-11-09). No IA executed, no construction or permitting news found.
Financing
Unannounced
About

The proposed project identified in the MISO interconnection queue as "Replacing 749 MW of coal generation with BESS; Campbell 3" (queue ID MISO-R1040) is a battery energy storage development project located in Ottawa County, Michigan. As its name indicates, the project is intended to replace 749 MW of coal-fired generation associated with Campbell 3 with a battery energy storage system (BESS). The queue classifies it as a hybrid project with a total capacity of 749 MW and lists both "Other" and "Battery" technology designations. Its single recorded component is a 749 MW "Other" component. No developer is identified in the available data.

The project entered the Midcontinent Independent System Operator (MISO) interconnection queue on November 9, 2023, and its status is active. It proposes to interconnect at the Campbell Substation at 345 kV, within the transmission system of METC, and has requested Network Resource Interconnection Service (NRIS). The proposed commercial operation date is March 31, 2028. The available data does not indicate the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

MI

County

Ottawa

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

METC

Entity

MISO

Service Type

NRIS

Point of Interconnection

Campbell Substation 345kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MICHIGAN.HUB
Hub Confidence
HIGH
POI Substation
Campbell Junction Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.