Replacing 49 MW of gas generation with BESS; Sterlington (MISO-R1039) — Project Summary

Queue ID
MISO-R1039
Capacity
49 MW
Technology
Solar
Status
active
Location
Ouachita, LA
Region
MISO
Developer
—
IA Status
—

Replacing 49 MW of gas generation with BESS; Sterlington

MISO-R1039BetaActiveSolarOtherMISOLBNL + Live

49 MW hybrid in Ouachita, LA · In queue since October 2023 · Proposed COD January 2025

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

49 MW

Capacity

1

Components

Solar

3 years

In Queue

—

IA Status

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

1y 3m

Schedule

21 months past proposed COD

Pre-Study0%
Queue EntryOct 5, 2023

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-01-31

About

The proposed project identified in the Midcontinent Independent System Operator (MISO) interconnection queue as "Replacing 49 MW of gas generation with BESS; Sterlington" (queue ID MISO-R1039) is a 49 MW development project located in Ouachita County, Louisiana. The queue lists it as a hybrid project, with technology entries of "Solar" and "Other." Its single listed component is 49 MW of solar capacity. The project's name refers to replacing 49 MW of gas generation with battery energy storage (BESS). The utility associated with the project is Entergy Louisiana. No developer is identified in the available data.

The project entered the MISO queue on October 5, 2023, and its status is active. It proposes to interconnect at the Sterlington 115 kV point of interconnection under Network Resource Interconnection Service (NRIS), with a proposed commercial operation date of January 31, 2025. The available data does not indicate the status of an interconnection agreement. The project has been linked, with a match confidence of 0.92, to an existing operating plant in U.S. Energy Information Administration (EIA) records: Sterlington Solar (EIA plant ID 66681).

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

LA

County

Ouachita

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

ENTERGY LOUISIANA

Entity

MISO

Service Type

NRIS

Point of Interconnection

Sterlington 115kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
LOUISIANA.HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
EES.OUACH_1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.