replacing 100MW of un-built solar with BESS; Mayhew
100 MW hybrid in Benton, MN · In queue since November 2023 · Proposed COD November 2025
100 MW
Capacity
1
Components
Other
2y 11m
In Queue
—
IA Status
COD target: 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2 years
Schedule
12 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-11-01
The proposed project identified in the Midcontinent Independent System Operator (MISO) interconnection queue as MISO-R1038, described as "replacing 100MW of un-built solar with BESS; Mayhew," is a battery energy storage development project in Benton County, Minnesota. The project totals 100 MW and is classified as a hybrid project type, with technology entries of "Other" and "Battery." Its one listed component is a 100 MW "Other" component. As the queue description indicates, the proposal would substitute battery energy storage system (BESS) capacity for 100 MW of previously planned solar generation that has not been built. The associated utility is Northern States Power Company.
The project entered the MISO queue on November 28, 2023, and its status is active. It has requested Network Resource Interconnection Service (NRIS) and would connect at the Mayhew Lake 115 kV point of interconnection. The proposed commercial operation date is November 1, 2025. The available data does not indicate the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MN
County
Benton
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
NORTHERN STATES POWER COMPANY
Entity
MISO
Service Type
NRIS
Point of Interconnection
Mayhew Lake 115kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- MINN.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about replacing 100MW of un-built solar with BESS; MayhewForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.