Replacing 37 MW of natural gas generation with BESS at Joppa; Joppa (MISO-R1029) — Project Summary

Queue ID
MISO-R1029
Capacity
37 MW
Technology
Battery
Status
active
Location
—
Region
MISO
Developer
—
IA Status
—

Replacing 37 MW of natural gas generation with BESS at Joppa; Joppa

MISO-R1029BetaActiveOtherBatteryMISOLBNL + Live

37 MW hybrid in — · In queue since December 2022 · Proposed COD December 2024

ISO/RTO: MISO

37 MW

Capacity

1

Components

Other

3y 10m

In Queue

—

IA Status

COD target: 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2 years

Schedule

23 months past proposed COD

Pre-Study0%
Queue EntryDec 12, 2022

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-12-01

About

The proposed project "Replacing 37 MW of natural gas generation with BESS at Joppa," identified in the Midcontinent Independent System Operator (MISO) interconnection queue as MISO-R1029, is a battery energy storage development with a total capacity of 37 MW. As its name indicates, the project is intended to replace 37 MW of existing natural gas generation with a battery energy storage system (BESS). The queue record classifies it as a hybrid project, with technology entries listed as "Other" and "Battery." Its single listed component is a 37 MW "Other" component. The data does not specify the county, state, or developer.

The project entered the MISO queue on December 12, 2022, and its status is listed as active. It proposes to interconnect at the Joppa 161kV Switchyard. The proposed commercial operation date is December 1, 2024. The available data does not report the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

—

County

—

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

—

Entity

MISO

Service Type

—

Point of Interconnection

Joppa 161kV Switchyard

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Hub Confidence
UNKNOWN
Nearest Node (Estimated)
AMIL.DR.JPPA
POI Substation
Joppa Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.