Project MISO-R1009 — Project Summary

Queue ID
MISO-R1009
Capacity
—
Technology
Other
Status
active
Location
Montmorency
Region
MISO
Developer
—
IA Status
—

MISO-R1009

MISO-R1009BetaActiveMISOLive · MISO

— generation in Montmorency · In queue since May 2021 · Proposed COD December 2023

ISO/RTO: MISO

—

Capacity

0

Components

5y 5m

In Queue

—

IA Status

COD target: 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 7m

Schedule

35 months past proposed COD

Pre-Study0%
Queue EntryMay 28, 2021

Interconnection request submitted to ISO/RTO

DPP Study

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-12-01

About

MISO-R1009 is a proposed generation development project in Montmorency County, Michigan, within the Midcontinent Independent System Operator (MISO) region. The project's technology is listed as "Other," and the available data do not specify its developer or total capacity. It is proposed to interconnect at the Consumers Energy 138 kV Progress St. Substation, in the transmission area of the Michigan Electric Transmission Company (METC).

The project entered the MISO interconnection queue on May 28, 2021, and its status remains active. It has requested Network Resource Interconnection Service (NRIS), which would allow it to serve as a network resource for load within the region. The project's proposed commercial operation date was December 1, 2023, which has already passed while the request is still listed as active in the queue. The available data do not report the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

—

County

Montmorency

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

—

Utility

METC

Entity

MISO

Service Type

NRIS

Point of Interconnection

Consumers Energy 138kV Progress St. Substation

Data Source

Live · MISO

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Hub Confidence
UNKNOWN
POI Substation
Progress

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project MISO-R1009
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.