MISO-R1009
— generation in Montmorency · In queue since May 2021 · Proposed COD December 2023
—
Capacity
0
Components
5y 5m
In Queue
—
IA Status
COD target: 2023
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 7m
Schedule
35 months past proposed COD
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-01
MISO-R1009 is a proposed generation development project in Montmorency County, Michigan, within the Midcontinent Independent System Operator (MISO) region. The project's technology is listed as "Other," and the available data do not specify its developer or total capacity. It is proposed to interconnect at the Consumers Energy 138 kV Progress St. Substation, in the transmission area of the Michigan Electric Transmission Company (METC).
The project entered the MISO interconnection queue on May 28, 2021, and its status remains active. It has requested Network Resource Interconnection Service (NRIS), which would allow it to serve as a network resource for load within the region. The project's proposed commercial operation date was December 1, 2023, which has already passed while the request is still listed as active in the queue. The available data do not report the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
—
County
Montmorency
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
—
Utility
METC
Entity
MISO
Service Type
NRIS
Point of Interconnection
Consumers Energy 138kV Progress St. Substation
Data Source
Live · MISO
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Hub Confidence
- UNKNOWN
- POI Substation
- Progress
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project MISO-R1009Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.